2022 Street Improvements Project Phase 3
Provide 2022 street improvements project phase 3 consists of full-depth asphalt reclamation includes 1 LS of temporary erosion control (including operational control of sw3p if required), complete in place, per unit; 1 LS of installation, relocation, and removal of temporary mailbox banks for use during construction for the maintenance of mail service in construction zones, complete in place, per unit; 6 EA of adjust existing sanitary sewer cleanout to final grade, complete per unit; 2 EA of adjust existing water valve and stack to final grade, complete per unit; 10 EA of adjust existing sanitary sewer manhole to final grade, complete per; 15 lot of locate existing irrigation systems, as required, and relocate systems, as needed due to construction, complete in place, per unit. See attached file.