Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install a gasket on the wet interior roof hatch. 2)Install handholds at the roof hatch. 3)Overflow discharge modification. 4)Replace the roof vent screen. 5)Reweld the sidewall stiffener in the wet interior.\r 6)Weld steel plates over the cathodic lift holes. Install bowl rigging couplings.\r 8)Replace the wet interior roof hatch - alternate. 9)Install a roof platform - alternate. 10)Install a wet interior ladder - alternate. 11)Install a riser grate - alternate.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
500,000 gallon double ellipse exterior overcoat, wet interior repaint, and miscellaneous repairs.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
500,000 gallon double ellipse exterior overcoat, wet interior repaint, and miscellaneous repairs.
AvailableWork includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system.\r \r Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces.\r \r Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system.\r \r Cathodic Protection: Install an impressed current cathodic protection system.\r \r Repairs:\r 1)Install a gasket on the wet interior roof hatch.\r 2)Install handholds at the roof hatches.\r 3)Install ladder extension at the condensate platform.\r 4)Install a sample tap on the fill/draw pipe.\r 5)Install a chemical feed tap on the fill/draw pipe.\r 6)Replace the expansion joint.\r 7)Install an aluminum jacketing over the fill/draw pipe insulation in the riser.\r 8)Replace the mud valve.\r 9)Overflow discharge modification.\r 10)Weld a rigging lug on the bowl.\r 11)Replace the dry interior light bulbs.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
City of Great Bend seeks proposals to refurbish and repair the 200,000‑gallon elevated Airport Industrial Park water tower, covering steel repairs/modifications, removal/installation of ladders and fall‑protection systems, roof and vent work, overflow modifications and removal of secondary overflow tank, installation of an IXOM GridBee GS‑9 (or approved equal) tank mixing system, interior/exterior SSPC‑SP10 abrasive blasting and specified multi‑coat tank coating system, coating touchups, level gauge repair, O&M manual, and compliance with bonding/insurance and reference requirements. Mandatory site visit required.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
City of Great Bend seeks proposals to refurbish and repair the 200,000‑gallon elevated Airport Industrial Park water tower, covering steel repairs/modifications, removal/installation of ladders and fall‑protection systems, roof and vent work, overflow modifications and removal of secondary overflow tank, installation of an IXOM GridBee GS‑9 (or approved equal) tank mixing system, interior/exterior SSPC‑SP10 abrasive blasting and specified multi‑coat tank coating system, coating touchups, level gauge repair, O&M manual, and compliance with bonding/insurance and reference requirements. Mandatory site visit required.
Work includes exterior repairs of a 31,330 SF apartment building in 2 levels including new roofing, replacement of windows and storefront with impact glazing, masonry repair and cleaning and painting; accessibility ramp.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Work includes exterior repairs of a 31,330 SF apartment building in 2 levels including new roofing, replacement of windows and storefront with impact glazing, masonry repair and cleaning and painting; accessibility ramp.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 5, 2025
Close: Jan 6, 2026
Work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system.\r \r Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces.\r \r Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system.\r \r Cathodic Protection: Install an impressed current cathodic protection system.\r \r Repairs:\r 1)Install a gasket on the wet interior roof hatch.\r 2)Install handholds at the roof hatches.\r 3)Install ladder extension at the condensate platform.\r 4)Install a sample tap on the fill/draw pipe.\r 5)Install a chemical feed tap on the fill/draw pipe.\r 6)Replace the expansion joint.\r 7)Install an aluminum jacketing over the fill/draw pipe insulation in the riser.\r 8)Replace the mud valve.\r 9)Overflow discharge modification.\r 10)Weld a rigging lug on the bowl.\r 11)Replace the dry interior light bulbs.