Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system.\r \r Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces.\r \r Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system.\r \r Cathodic Protection: Install an impressed current cathodic protection system.\r \r Repairs:\r 1)Install a gasket on the wet interior roof hatch.\r 2)Install handholds at the roof hatches.\r 3)Install ladder extension at the condensate platform.\r 4)Install a sample tap on the fill/draw pipe.\r 5)Install a chemical feed tap on the fill/draw pipe.\r 6)Replace the expansion joint.\r 7)Install an aluminum jacketing over the fill/draw pipe insulation in the riser.\r 8)Replace the mud valve.\r 9)Overflow discharge modification.\r 10)Weld a rigging lug on the bowl.\r 11)Replace the dry interior light bulbs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
500,000 gallon double ellipse exterior overcoat, wet interior repaint, and miscellaneous repairs.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
500,000 gallon double ellipse exterior overcoat, wet interior repaint, and miscellaneous repairs.
AvailableWork consist of abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. See outside link.
Posted Date
Oct 6, 2025
Due Date
Dec 16, 2025
Release: Oct 6, 2025
Close: Dec 16, 2025
Work consist of abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. See outside link.
AvailableExterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install a gasket on the wet interior roof hatch. 2)Install handholds at the roof hatch. 3)Overflow discharge modification. 4)Replace the roof vent screen. 5)Reweld the sidewall stiffener in the wet interior.\r 6)Weld steel plates over the cathodic lift holes. Install bowl rigging couplings.\r 8)Replace the wet interior roof hatch - alternate. 9)Install a roof platform - alternate. 10)Install a wet interior ladder - alternate. 11)Install a riser grate - alternate.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane fluoropolymer system. Foundation: Water clean and apply a two (2) coat epoxy system. Repairs: 1)Install a gasket on the wet interior roof hatch. 2)Install handholds at the roof hatch. 3)Overflow discharge modification. 4)Replace the roof vent screen. 5)Reweld the sidewall stiffener in the wet interior.\r 6)Weld steel plates over the cathodic lift holes. Install bowl rigging couplings.\r 8)Replace the wet interior roof hatch - alternate. 9)Install a roof platform - alternate. 10)Install a wet interior ladder - alternate. 11)Install a riser grate - alternate.
Overcoat exterior appurtenances, repaint the wet interior piping and miscellaneous repairs on the 500,000 gallon and 2,000,000 gallon concrete reservoirs.
Posted Date
Nov 4, 2025
Due Date
Jan 22, 2026
Release: Nov 4, 2025
Close: Jan 22, 2026
Overcoat exterior appurtenances, repaint the wet interior piping and miscellaneous repairs on the 500,000 gallon and 2,000,000 gallon concrete reservoirs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis