Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
City of Great Bend seeks proposals to refurbish and repair the 200,000‑gallon elevated Airport Industrial Park water tower, covering steel repairs/modifications, removal/installation of ladders and fall‑protection systems, roof and vent work, overflow modifications and removal of secondary overflow tank, installation of an IXOM GridBee GS‑9 (or approved equal) tank mixing system, interior/exterior SSPC‑SP10 abrasive blasting and specified multi‑coat tank coating system, coating touchups, level gauge repair, O&M manual, and compliance with bonding/insurance and reference requirements. Mandatory site visit required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 5, 2025
Close: Jan 15, 2026
Elevated water storage tank.
AvailableWork includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
AvailableSeeking existing 150,000 gallon elevated tank rehabilitation, painting, repair & containment.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Seeking existing 150,000 gallon elevated tank rehabilitation, painting, repair & containment.
AvailableDemolition of one (1) steel pedestal elevated tank; Construction of one (1) 250,000-gallon welded steel elevated tank and respective site improvements; Rehabilitation of five (5) existing 100,000-gallon welded steel elevated tanks. Rehabilitation includes interior and exterior blast cleaning and coating, replacing tank appurtenances, disinfection, and other miscellaneous repairs.
Posted Date
Nov 23, 2025
Due Date
Jan 8, 2026
Release: Nov 23, 2025
Close: Jan 8, 2026
Demolition of one (1) steel pedestal elevated tank; Construction of one (1) 250,000-gallon welded steel elevated tank and respective site improvements; Rehabilitation of five (5) existing 100,000-gallon welded steel elevated tanks. Rehabilitation includes interior and exterior blast cleaning and coating, replacing tank appurtenances, disinfection, and other miscellaneous repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis