2.10 mi of hot mix asphalt reconstruction, drainage, shared-use path construction, concrete curb, gutter and sidewalk, box culvert replacement, guardrail, geotechnical construction, signage and pavement markings on M-66 from south of Tuttle Road to Wells Street in the city of Ionia, Ionia County.
Description: The Michigan Department of Transportation seeks bids for 2.10 miles of reconstruction on M-66 from south of Tuttle Road to Wells Street in Ionia, including drainage, a shared-use path, curb, gutter and sidewalk, box culvert replacement, guardrail, geotechnical work, signage and pavement markings. The project includes a five-year materials and workmanship pavement warranty and a two-year concrete surface coating warranty, and requires a pre-bid meeting on October 15, 2026. Bids are due November 6, 2026 at 10:30 a.m. local time, and the project completion date is June 9, 2028.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work includes approx 250 LF temporary fence: 186 CY earth excavation: 254 CY removal and disposal of unsuitable material: 1,730 SY erosion control blanket: 4,654 LF modified urethane pavement marking - line 4". See outside link.
The project covers 1.12 miles of hot mix asphalt cold milling and resurfacing, concrete curb, gutter and sidewalk, signing, and pavement markings on M-85 (Fort Street) from Rosa Parks easterly to Griswold Street in Detroit. The advertisement specifies a five-year materials and workmanship pavement warranty and 2% DBE participation. Bids are due at the November 6, 2026 letting at 10:30 a.m. local time.