Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
San Bernardino County’s Architecture & Engineering (CIP) is soliciting sealed bids to replace restroom and shower facilities at Mojave River Forks Regional Park in Hesperia, CA. A mandatory pre‑bid meeting will be held on January 27, 2026 at 10:00 a.m. on site. The solicitation was posted January 20, 2026 and bids are due March 4, 2026 at 1:00:59 PM local time via the County’s ePro system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This project involves the replacement of an existing shower house and laundry facility with a new design shower house including 8 showers, 6 restrooms, and a laundry at Wakonda State Park. The new structure will feature reinforced concrete block walls and a wood-framed roof with asphalt shingles.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This project involves the replacement of an existing shower house and laundry facility with a new design shower house including 8 showers, 6 restrooms, and a laundry at Wakonda State Park. The new structure will feature reinforced concrete block walls and a wood-framed roof with asphalt shingles.
AvailableThe project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
Posted Date
Dec 14, 2025
Due Date
Feb 3, 2026
Release: Dec 14, 2025
Close: Feb 3, 2026
The project includes construction work involving mechanical, electrical, plumbing, and general trades, as well as utility connections, landscaping, hardscaping, demolition of the old restroom, commissioning, and maintenance period.
AvailableWork includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Work includes but is not limited to; demolish four (4) existing restroom buildings and adjacent concrete pads, this includes disconnecting existing water and sewer connections as well as electrical connections; reconfigure accessible pathways as necessary as well as accessible parking locations, including edge grind existing paving, install new paving, striping, concrete, curbing, wheel stops, signage and bollards. Construct new concrete pathways; re-grade pads, prep pads per pre-manufactured restroom requirements, procure and install four new prefabricated restroom buildings, new concrete around new restrooms, connection of existing feeder to new restrooms power panel, addition of convenience circuits in mechanical room and install new water and sewer tie ins, shutoff valves, pipes, cleanouts and appurtenances. Landscaping edging, bonded cobble rock, irrigation retrofit and grass seeding.
Work includes campground #4 shower house replacement.
Posted Date
Dec 16, 2025
Due Date
Feb 3, 2026
Release: Dec 16, 2025
Work includes campground #4 shower house replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis