16091-225199 - 5.44 mi of concrete crack sealing, joint resealing, asphalt repair mastic, pavement repairs and pavement markings on I-75 from north of Topinabee Mail Route Road north to Riggsville Road, Cheboygan County. RFP
Description: 5.44 mi of concrete crack sealing, joint resealing, asphalt repair mastic, pavement repairs and pavement markings on I-75 from north of Topinabee Mail Route Road north to Riggsville Road, Cheboygan County. Required DBE Participation: 0.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 1318 N9-3F ** Completion Date: 10/30/2027 12:00:00 AM
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work consists of cleaning, filling, and leveling cracks, potholes, and alligatored areas with asphalt repair mastic material. Crack filling and pavement distress repair with asphalt repair mastic includes furnishing, hauling, and placing of all materials, the removal and disposal of old filler and debris.
5.08 mi of hot mix asphalt cold milling and resurfacing and pavement markings, pavement repairs, concrete barrier repairs, concrete patching repairs, drainage repairs and pavement markings.
Construction of grading, asphalt concrete surfacing, signing, pavement markings, and watermain improvements on Reservoir Road and Lamb Road in Pennington County, South Dakota.
0.95 mi of hot mix asphalt reconstruction, aggregate base, aggregate shoulders, drainage work, signing and pavement markings on Oakville Waltz Road from Palmer Road to Rawsonville Road, Monroe County. This is a Local Agency project. Required DBE Participation: 5.00% Required SBP Participation: 0.00% Net Classification Required For This Project: ** 2309 Cb or 2309 Ea ** Completion Date: 10/15/2027 12:00:00 AM