Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fulton County School District
Seeking a qualified contractor to provide a hypochlorous acid onsite generator system.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Gardner
Seeking a licensed contractor to remove our existing diesel backup generator system and install a new caterpillar c13 generator and asco c300 automatic transfer switch. Safely disconnect and remove the existing generator and associated components. Properly dispose of equipment in compliance with all applicable environmental and safety regulations. Remove bollards as needed (bollards to be saved for reinstallation by city). Evaluate the site and prepare for the installation of new equipment. Install a new caterpillar c13 generator system provided by foley equipment. Install new concrete pad as required for new generator system. See outside link.
Posted Date
Oct 28, 2025
Due Date
Nov 18, 2025
Release: Oct 28, 2025
City of Gardner
Close: Nov 18, 2025
Seeking a licensed contractor to remove our existing diesel backup generator system and install a new caterpillar c13 generator and asco c300 automatic transfer switch. Safely disconnect and remove the existing generator and associated components. Properly dispose of equipment in compliance with all applicable environmental and safety regulations. Remove bollards as needed (bollards to be saved for reinstallation by city). Evaluate the site and prepare for the installation of new equipment. Install a new caterpillar c13 generator system provided by foley equipment. Install new concrete pad as required for new generator system. See outside link.
City of Newport
Provide equipment and installation of a new large onsite septic system (L.O.S.S). Construction of the new septic system procurement, installation, and commissioning in conformance with the project. The system shall include pumps, electrical systems and control panels, piping mechanical systems, and all other appurtenances required to render the system fully functional. In addition, the contractor shall abandon existing septic tanks associated with the existing FBO/FedEx buildings and Coast Guard.
Posted Date
Oct 29, 2025
Due Date
Nov 19, 2025
Release: Oct 29, 2025
City of Newport
Close: Nov 19, 2025
Provide equipment and installation of a new large onsite septic system (L.O.S.S). Construction of the new septic system procurement, installation, and commissioning in conformance with the project. The system shall include pumps, electrical systems and control panels, piping mechanical systems, and all other appurtenances required to render the system fully functional. In addition, the contractor shall abandon existing septic tanks associated with the existing FBO/FedEx buildings and Coast Guard.
AvailableCowlitz County
Install a replacement large onsite septic system (LOSS) including a new tank, drainfield, and distribution system in the Camelot development includes 1,215 LF removing wire fence, 890 LF roadway excavation - new access road and stockpile relocation, 3,675 LF testing pipe (delivery piping), 90 LF 8" PVC 3034 sanitary sewer pipe, 10" PVC 3024 temporary bypass system, LOSS drainfield piping (complete), LOSS pumps delivery system, LOSS controls system, LOSS electrical installation, abandon existing drainfield.
Posted Date
Oct 24, 2025
Due Date
Nov 24, 2025
Release: Oct 24, 2025
Cowlitz County
Close: Nov 24, 2025
Install a replacement large onsite septic system (LOSS) including a new tank, drainfield, and distribution system in the Camelot development includes 1,215 LF removing wire fence, 890 LF roadway excavation - new access road and stockpile relocation, 3,675 LF testing pipe (delivery piping), 90 LF 8" PVC 3034 sanitary sewer pipe, 10" PVC 3024 temporary bypass system, LOSS drainfield piping (complete), LOSS pumps delivery system, LOSS controls system, LOSS electrical installation, abandon existing drainfield.
AvailableState of Nevada Public Works Board
The Project is to renovate the existing 375 kW generator internal components, DC charging system, DC battery charging system, standby batteries, and will also install a load bank, and wall mounted metal roof structure. Project will also test and commission building electrical system per approved plans and specifications.
Posted Date
Oct 21, 2025
Due Date
Nov 19, 2025
Release: Oct 21, 2025
State of Nevada Public Works Board
Close: Nov 19, 2025
The Project is to renovate the existing 375 kW generator internal components, DC charging system, DC battery charging system, standby batteries, and will also install a load bank, and wall mounted metal roof structure. Project will also test and commission building electrical system per approved plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis