Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work under this contract shall consist of removing asphalitic surface milling, common excavation, base aggregate dense, concrete pavement, structure work B-61-282 will include concrete surface repair and concrete overlay. Underground work will include replacement of sanitary sewer, water main, storm sewer and all incidental items necessary to complete the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
ADA Curb Ramps Project consists of the following:Provide Materials and labor to design and construct ADA curb ramps, road repair, mill and overlay various streets within the City
Posted Date
Dec 31, 2025
Due Date
Feb 2, 2026
Release: Dec 31, 2025
Close: Feb 2, 2026
ADA Curb Ramps Project consists of the following:Provide Materials and labor to design and construct ADA curb ramps, road repair, mill and overlay various streets within the City
AvailableProvide omicron cmc 500 ush protective relay test set to be used in our electrical and automation technology program.
Posted Date
Dec 30, 2025
Due Date
Jan 12, 2026
Release: Dec 30, 2025
Close: Jan 12, 2026
Provide omicron cmc 500 ush protective relay test set to be used in our electrical and automation technology program.
AvailableWork include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
DESIGN-BUILD - This is a partial design build roadway project. Design activities are limited to: concrete curb ramps, temporary curb ramps, concrete bike ramps. For the construction of a roundabout, drainage upgrades, curb and sidewalk replacement, highway lighting upgrades, signing, pavement markings, milling and resurfacing, and other miscellaneous construction.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
DESIGN-BUILD - This is a partial design build roadway project. Design activities are limited to: concrete curb ramps, temporary curb ramps, concrete bike ramps. For the construction of a roundabout, drainage upgrades, curb and sidewalk replacement, highway lighting upgrades, signing, pavement markings, milling and resurfacing, and other miscellaneous construction.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis