1347464: IEPA SRF Census Tract 8 - Block Level Lead Service Line Replacements RFP
Description: Work includes approx 900 LF televised inspection of sewers and sewer structures; 400 LF sewer cleaning; 550 LF insulation of water service; 100 LF replacement of existing sewer with 8" DI pipe; 200 LF replacement of existing house drain with PVC pipe; 4,150 new exterior water service. See attached file.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Work includes approx 750 LF televised inspection of sewers and sewer structures; 300 LF sewer cleaning; 450 LF insulation of water service; 200 LF replacement of existing sewer with 8" DI pipe; 600 LF replacement of existing house drain with PVC pipe; 3,900 new exterior water service. See attached file.
850 LF televised inspection of sewers and sewer structures; 350 LF sewer cleaning; 550 LF insulation of water service; 100 LF replacement of existing sewer with 8" DI pipe; 600 LF replacement of existing house drain with PVC pipe; 4,150 new exterior water service. See attached file.
Work includes approx 500 LF televised inspection of sewers and sewer structures; 200 LF sewer cleaning; 300 LF insulation of water service; 200 LF replacement of existing sewer with 8" DI pipe; 600 LF replacement of existing house drain with PVC pipe; 4,200 new exterior water service. See attached file.
Work includes approx 700 LF televised inspection of sewers and sewer structures; 350 LF sewer cleaning; 450 LF insulation of water service; 100 LF replacement of existing sewer with 8" DI pipe; 600 LF replacement of existing house drain with PVC pipe; 4,200 new exterior water service. See attached file.
RFP documents & timeline
From the first pre-RFP signals to the published RFP and its files.
1 file available
Strategic plan
The 2025-2029 CIP lists a 2025-2026 sewer construction-with-LSLR project with $88,267,775 in listed funding.
The 2025-2029 CIP lists block-level LSLR construction programs, with listed funding, for 2025 through 2028.
See sourceHide source
2025 - 2029 Capital Improvement Program WATER SYSTEM - WATER DISTRIBUTION Fund Total Prior Years 2025 2025-2029Phase Start and End Dates 45459 2027 - Leaks & Breaks LSLR 0GOF - Bond 0 0 35,155,20035,155,200 0WIF - Federal-WIFIA 0 0 67,268,00067,268,000 WBOF - Bond 0 0 8,851,0008,851,000 0111,274,200 0 111,274,200 Construct. 2027 2027 45460 2028 - Leaks &…
Budget
The FY2026 appropriation ordinance lists $6,481,000 for DWM's HUD CDBG CARES Act Lead Service Line Replacement grant.