Oklahoma Department of Transportation
State AgencyOK
Posted
Jun 1, 2020
Oct 15, 2026
145, 31302(04), STP-246C(074)CI - Grade, Drain & Surface
Approx. 1 LS Clearing and grubbing; 46,922 CY unclassified excavation; 98,904 SY solid slab sodding; 42 AC mowing; 103 CY structural excavation unclassified; 4,887 Ton type I plain riprap; 1,221 LF sawing pavement; 75 LF beam guardrail W-beam single; 12 EA guardrail end treatment (31"); 66.260 SF sheet aluminum signs; 87,908 LF (SP) traffic stripe(plural-component)(4" wide). Project length = 4.162 mi. See attached file and outside link.
