GBW: Electrical Conduit Replacement RFP
Qualified contractors to install a new 200amp 3 phase 120/208 feeder from the front boiler room to the electrical distribution room. Contractor to locate and verify all underground private and public utility lines. Contractor to excavate approx, 200 FT of electrical trench at 36” deep for electrical conduit. Contractor to install 2 PVC conduits, one to be capped for future use. Contractor to backfill conduit with clean sand and existing materials. Vendor will sub-grade any disturbed areas. Trench to be paved and 6” steel bollard to be installed near entry.