Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of sewer extension, includes 13,100 SY of rolled erosion prevention category 25; 2,500 LF of silt fence, type ms - maintained; 2,400 LF of bale barriers - maintained; 1,600 LF of improved pipe foundation; 1,036 LF of 12" pvc sanitary sewer pipe, sdr 26; 210 LF of 12" pvc sanitary sewer pipe, c900; 126 LF of 8" pvc sanitary sewer pipe, sdr 26; 64 cy of common excavation - offsite (ev) (p); 35 LF of 6: pvc sanitary service pipe, sch. 40; 20 LF of 4 ft dia. Sanitary structure overdepth; 3 ton of mulch material type 3. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor shall perform all the work for the construction of approx. 3,000 LF of 15" VCP trunk sewer, 900 LF of 8" VCP sewer main, manholes, sewer service laterals, 8" PVC water main and appurtenances in accordance with these specifications and the contract drawings including abandonment of existing septic tanks and dispersal systems, implementation of construction traffic control, saw cutting pavement, trenching, shoring, dewatering, backfilling, compaction, and restoration of AC pavement, traffic signal loops, signing and striping.
Posted Date
Dec 9, 2025
Due Date
Jan 27, 2026
Release: Dec 9, 2025
Close: Jan 27, 2026
Contractor shall perform all the work for the construction of approx. 3,000 LF of 15" VCP trunk sewer, 900 LF of 8" VCP sewer main, manholes, sewer service laterals, 8" PVC water main and appurtenances in accordance with these specifications and the contract drawings including abandonment of existing septic tanks and dispersal systems, implementation of construction traffic control, saw cutting pavement, trenching, shoring, dewatering, backfilling, compaction, and restoration of AC pavement, traffic signal loops, signing and striping.
AvailableRFP for the construction of concrete paving, utilities, and appurtenant work for the Fernau Avenue Extension.
Posted Date
Jan 23, 2026
Due Date
Feb 16, 2026
Release: Jan 23, 2026
Close: Feb 16, 2026
RFP for the construction of concrete paving, utilities, and appurtenant work for the Fernau Avenue Extension.
AvailableProject consists of sewer extension.
Posted Date
Sep 14, 2025
Due Date
Feb 5, 2026
Release: Sep 14, 2025
Close: Feb 5, 2026
Project consists of sewer extension.
AvailableThe project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
The project is for the installation of HDPE pipe via the pipe bursting method of approx. 1,000 LF of existing 8" sewer along the 600 block of Lexington Avenue and 1st Street between Lexington Avenue and Holland Avenue, manhole rehabilitation of three (3) manholes, reconnection and replacement of sewer services and pavement restoration, located in the Avenues subdivision of Cayce.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →