Description: Approx. 813.80 U Clearing & grubbing; 6,817 CY compaction with M & D control; 360 LF conduit; 639 LF curb & gutter PCC; 1,669 SY drives, PCC; 7,950 LF electrical curcuits; 371 SY engineering fabric; 21,023 CY excavation class 10; 3,938 CY modified subbase; 4.20 AC mowing; 2.10 AC mulching; 26 EA patches by count. See attached files.
StateAgency · IA, US
Decision makers connected to this RFP from Iowa Department of Transportation.
Adjacent opportunities open for bidding right now.
Iowa Department of Transportation
State AgencyIA
Posted
Oct 20, 2026
Nov 17, 2026
Approx. 559 CY Excavation class 20; 1 EA handhole; 3 EA overhead sign support structure; 69 LF posts, metal, for signs; 19,274 P reinforcing steel, epoxy coated; 47 SF signs, type A; 608 SF signs, type B; 121.70 CY structural concrete. See attached files.
Iowa Department of Transportation
State AgencyIA
Posted
-
Nov 17, 2026
Approx. 2 EA Aprons; 145.20 U clearing & grubbing; 189 LF curb & gutter PCC; 308 SY drives, PCC; 7,600 CY embankment-in-place; 10,361 CY excavation class 10; 374 LF sewer sanitary; 1,186 LF sewer, storm; 659 SY sidewalk, PCC; 172 SF signs, type A; 2,109 LF subdrain; 1,466 CY topsoil, strip/salvage/spread; 1,130 LF water main. See attached files.
Iowa Department of Transportation
State AgencyIA
Posted
Oct 20, 2026
Nov 17, 2026
Approx. 3,221 CY Excavation class 10; 3,174 Ton granular shoulders, type B; 3 AC mulching; 147.70 Station pavement markings; 22,084 SY pavement, P.C.C.; 21,164 SY removal of pvmnt/drives/sdwk; 1.50 AC seeding & fertilizing; 173.20 Station shoulder finishing; 1.50 AC stabilizing crop, seed & fert. See attached files.
Iowa Department of Transportation
State AgencyIA
Posted
Oct 20, 2026
Nov 17, 2026
Approx. 69.20 LF Curb & gutter P.C.C.; 387 CY embankment-in-place; 2,990 CY excavation class 10; 245.10 CY excavation class 20; 193 CY granular backfill; 194.20 Ton granular shoulders, type B; 21.50 SY median, PCCC; 6.28 AC mowing; 0.09 AC native grass seeding; 4,170.30 SY paved shoulders. See attached files.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
588 days before RFP
The Commission approved 2026–2030 statewide funding targets including non-interstate pavement modernization for pavement rehabilitation.
County Line Item Type Of Work 2026 2027 2028 2029 2030 Statewide Non-Interstate Pavement Modernization Pavement Rehab 205,000 220,000 230,000 235,000 Statewide Statewide Safety Specific Paving 35,000 36,000 37,000 38,000 Statewide Americans with Disabilities Act Pedestrian Improvement 5,000 5,500 6,000 6,500 7,000 Statewide Construction Industry Training…