CityIA
Aug 13, 2026
Closes
Sep 2, 2026
10288273 - 2026 WWTF Stormwater Improvements
Project consists of tree removals, site clearing and grading, storm sewer piping and structures, stormwater erosion repairs, and site restoration.
Description: Project consists of tree removals, site clearing and grading, storm sewer piping and structures, stormwater erosion repairs, and site restoration.
City · IA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIA
Aug 13, 2026
Closes
Sep 2, 2026
Project consists of tree removals, site clearing and grading, storm sewer piping and structures, stormwater erosion repairs, and site restoration.
CitySD
Aug 12, 2026
Closes
Sep 30, 2026
The Contract scope for the project consists of the follow bid packages: 01C – General Construction; 02A – Construction Staking; 02B – Materials Testing; 03A – Foundation and Site Concrete; 03B – Precast Concrete; 05B – Miscellaneous Metals; 07A – Membrane Roofing; 07G – Joint Sealants; 08B – Doors and Hardware 08C – Overhead and Coiling Doors; 09E – Painting and Coating; 22A – Plumbing; 23A – HVAC 23B – Plumbing/HVAC Combined; 26A – Electrical and Communications; 31A – Earthwork and Utilities; 46A – Process Piping and Equipment;
CityPA
Aug 8, 2026
Closes
Sep 1, 2026
The Borough of Shickshinny is soliciting bids through an open IFB for CRARY STREET STORMWATER IMPROVEMENTS, covering replacement of storm drainage facilities in Crary Street. The work includes complete restoration on Crary Street and associated roadways. The posting identifies a fixed-fee contract, opened Aug 8th 2026, 8:00 AM EDT, closes Sep 1st 2026, 2:00 PM EDT, and provides construction plans and a project manual; no grant-program language appears on the detail page.
Albany, City of - Water & Water Supply Department
Special DistrictNY
Aug 18, 2026
Closes
Sep 22, 2026
Project includes providing all labor, materials, machinery, tools, equipment and other means of construction to construct stormwater improvements.
Procurement and program contacts connected to City of Asbury.