Summary
Replace the hoist ropes on one (1) traction passenger elevator (State ID #37419 / Car #3), configured as a 2:1 roping system, double-wrapped with hitches in the secondary. Specifically: Remove elevator from service and post required notices. Two (2) two-man crews to safely cut out failed ropes and suspend/secure the car and counterweight within the hoistway in preparation for new installation. Furnish and install a new set of traction steel hoist ropes, 5/8" diameter, of proper size and characteristics matching equipment requirements (8x19 construction or as specified by elevator OEM). Attach new ropes to existing hitch plates; install new wedge shackles as required. Verify proper rope length, unhang car and counterweight, and run elevator. Perform tensioning adjustments to equalize rope tension for optimum performance using a telectronic (electronic) tensioning system; provide tension readings as part of
close-out documentation.