Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge Wearing Surface Replacement and other incidental work. Discription: WIN: 030343:00. Project length: 0.03 mi.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide bridge over the calumet river rehabilitation.
Posted Date
Jan 15, 2026
Due Date
Feb 25, 2026
Release: Jan 15, 2026
Close: Feb 25, 2026
Provide bridge over the calumet river rehabilitation.
AvailablePerform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Perform dismantling, removal, and disposal of the existing pedestrian bridge superstructure and designing, fabricating, furnishing and installing a replacement prefabricated pedestrian bridge superstructure attached to the existing bridge abutments with reconstructed anchor bolts. The replacement prefabricated pedestrian bridge superstructure shall resemble the attached original bridge plans in terms of make, general appearance and aesthetic appeal.
AvailableThis RFP is for the replacement of Bridge No. 05068.
Posted Date
Jan 2, 2026
Due Date
Feb 4, 2026
Release: Jan 2, 2026
Close: Feb 4, 2026
This RFP is for the replacement of Bridge No. 05068.
AvailableRelease: Sep 30, 2025
Close: Feb 17, 2026
Rehabilitation of the main street bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis