CountyGA
Posted
Sep 17, 2026
Nov 3, 2026
Rome Water Reclamation Facility Rehabilitation of Secondary Clarifiers (Request for Qualifications )
Design build: work includes water reclamation facility rehabilitation of secondary clarifiers.
Description: The solicitation seeks rehabilitation of secondary clarifiers at the Rome Water Reclamation Facility under solicitation 026-26. It is an open City of Rome, Georgia procurement published on September 17, 2026. Responses are due November 3, 2026, at 2:00 PM EST.
City · GA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyGA
Posted
Sep 17, 2026
Nov 3, 2026
Design build: work includes water reclamation facility rehabilitation of secondary clarifiers.
Special DistrictWA
Posted
Sep 16, 2026
Oct 27, 2026
Work includes furnishing labor, materials, equipment, and appurtenances necessary to replace the clarifier mechanisms in primary clarifier no. 1, primary clarifier no. 2, secondary clarifier no. 1, and secondary clarifier no. 2 at the wastewater treatment plant (wwtp).
CityNC
Posted
-
Oct 15, 2026
Rehabilitation of Secondary Clarifiers 1 and 2 at the Monroe Wastewater Treatment Plant, including demolition of existing equipment and installation of new clarifier equipment, weirs, baffles, chlorine feed piping system, PRVs, control panels, associated electrical accessories, access walkways, platforms, handrails, and mechanism swept-in grout.
CountyFL
Posted
Sep 9, 2026
Oct 21, 2026
The project will include the design of an additional 1,000,000 gallons of sludge storage in a new above-ground tank with associated aeration/mixing equipment, sludge transfer capability, polymer system, and other appurtenances. The work also includes the repair/replacement of two existing gravity belt thickeners with piping and controls and rehabilitation of the thickener equipment. Also included are the demolition and replacement of the existing mixing systems in the two existing sludge storage tanks, the expansion of the existing blower building, and new electfrical building.
Decision makers connected to this RFP from City of Rome.