Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 330 SY removing asphaltic surface; 513 SY removing asphaltic surface butt joints; 140,017 SY removing asphaltic surface milling; 1,835 CY excavation; 39,775 LF asphaltic rumble strips, shoulder; 170 CY concrete masonry bridges; 136 SY protective surface treatment; 1,330 LF piling steel hp 12" x 53 lb; 137 CY riprap heavy; 162 LF pipe underdrain wrapped 6"; 225 LF mgs guardrail 3; 157 LF mgs thrie beam transition; 1,407 SY erosion mat class i type b; 71,015 LF temporary marking line paint 6"; 126 LF construction staking curb gutter and curb & gutter.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for highway construction services including asphaltic surface milling, HMA pavement, paved shoulder widening, culvert replacement, beam guard adjustments, base aggregate, rumble strips, traffic control, and pavement marking.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Procurement for highway construction services including asphaltic surface milling, HMA pavement, paved shoulder widening, culvert replacement, beam guard adjustments, base aggregate, rumble strips, traffic control, and pavement marking.
AvailableWork include 161 LF removing guardrail; 734 CY excavation common; 35 SY concrete pavement 6"; 135 SY concrete pavement approach slab; 257 CY concrete masonry bridges; 421 SY protective surface treatment; 324 LF prestressed girder type i 36w-inch; 247 LF railing tubular type m; 240 LF pre-boring rock or consolidated materials; 280 LF piling steel hp 10" x 42 lb; 210 CY riprap heavy; 220 LF pipe underdrain wrapped 6"; 157 LF mgs thrie beam transition; 750 SY salvaged topsoil; 685 SY mulching; 1,576 LF marking line paint 4"; 60 LF sawing asphalt.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 161 LF removing guardrail; 734 CY excavation common; 35 SY concrete pavement 6"; 135 SY concrete pavement approach slab; 257 CY concrete masonry bridges; 421 SY protective surface treatment; 324 LF prestressed girder type i 36w-inch; 247 LF railing tubular type m; 240 LF pre-boring rock or consolidated materials; 280 LF piling steel hp 10" x 42 lb; 210 CY riprap heavy; 220 LF pipe underdrain wrapped 6"; 157 LF mgs thrie beam transition; 750 SY salvaged topsoil; 685 SY mulching; 1,576 LF marking line paint 4"; 60 LF sawing asphalt.
Work include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
Street and utility reconstruction, consisting of: 8" Sanitary sewer (1,175 LF); 8" water main (1,500 LF); 4" and 6" Concrete (4,000 SF); Hot-Mix Asphalt (1,550 tons); Concrete Curb & Gutter (2,500 LF); Grass restoration (1,650 SY).
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
Street and utility reconstruction, consisting of: 8" Sanitary sewer (1,175 LF); 8" water main (1,500 LF); 4" and 6" Concrete (4,000 SF); Hot-Mix Asphalt (1,550 tons); Concrete Curb & Gutter (2,500 LF); Grass restoration (1,650 SY).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis