Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 161 LF removing guardrail; 734 CY excavation common; 35 SY concrete pavement 6"; 135 SY concrete pavement approach slab; 257 CY concrete masonry bridges; 421 SY protective surface treatment; 324 LF prestressed girder type i 36w-inch; 247 LF railing tubular type m; 240 LF pre-boring rock or consolidated materials; 280 LF piling steel hp 10" x 42 lb; 210 CY riprap heavy; 220 LF pipe underdrain wrapped 6"; 157 LF mgs thrie beam transition; 750 SY salvaged topsoil; 685 SY mulching; 1,576 LF marking line paint 4"; 60 LF sawing asphalt.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 648 SY removing asphaltic surface; 225 LF removing curb & gutter; 67 SY removing concrete sidewalk; 47 LF removing storm sewer (size) 01. 12"; 312 CY excavation common; 27 SY concrete pavement 12"; 74 SY concrete pavement approach slab; 273 CY concrete masonry bridges; 359 SY protective surface treatment; 151 LF railing steel type c6; 1,470 LF piling cip concrete 12 3/4 x 0.50"; 142 LF concrete curb & gutter 30" type d; 961 SF concrete sidewalk 4"; 633 SF concrete sidewalk 6"; 517 LF marking line epoxy 4".
AvailableThe proposed work consists of removing old structure, excavation common, base aggregate dense, heavy riprap, permanent signing, pavement marking, structure B-27-186, finishing items, traffic control, construction staking, bird deterrent system, and any incidental items necessary to complete the work.
Posted Date
Jan 5, 2026
Due Date
Jan 22, 2026
Release: Jan 5, 2026
Close: Jan 22, 2026
The proposed work consists of removing old structure, excavation common, base aggregate dense, heavy riprap, permanent signing, pavement marking, structure B-27-186, finishing items, traffic control, construction staking, bird deterrent system, and any incidental items necessary to complete the work.
AvailableWork consists of approx. 15,380 CY of excavation common; 12,292 TON of base aggregate dense 1 1/4"; 26,267 SY of concrete pavement 8"; 14,044 SF of concrete sidewalk 5"; 14,940 LF of temporary marking line removable tape 6"; 10,890 LF of construction staking curb gutter and curb and gutter; 31,055 SY of removing concrete pavement; 6,852 SY of sod lawn; see outside link for more details.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Work consists of approx. 15,380 CY of excavation common; 12,292 TON of base aggregate dense 1 1/4"; 26,267 SY of concrete pavement 8"; 14,044 SF of concrete sidewalk 5"; 14,940 LF of temporary marking line removable tape 6"; 10,890 LF of construction staking curb gutter and curb and gutter; 31,055 SY of removing concrete pavement; 6,852 SY of sod lawn; see outside link for more details.
AvailableWork include 330 SY removing asphaltic surface; 513 SY removing asphaltic surface butt joints; 140,017 SY removing asphaltic surface milling; 1,835 CY excavation; 39,775 LF asphaltic rumble strips, shoulder; 170 CY concrete masonry bridges; 136 SY protective surface treatment; 1,330 LF piling steel hp 12" x 53 lb; 137 CY riprap heavy; 162 LF pipe underdrain wrapped 6"; 225 LF mgs guardrail 3; 157 LF mgs thrie beam transition; 1,407 SY erosion mat class i type b; 71,015 LF temporary marking line paint 6"; 126 LF construction staking curb gutter and curb & gutter.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work include 330 SY removing asphaltic surface; 513 SY removing asphaltic surface butt joints; 140,017 SY removing asphaltic surface milling; 1,835 CY excavation; 39,775 LF asphaltic rumble strips, shoulder; 170 CY concrete masonry bridges; 136 SY protective surface treatment; 1,330 LF piling steel hp 12" x 53 lb; 137 CY riprap heavy; 162 LF pipe underdrain wrapped 6"; 225 LF mgs guardrail 3; 157 LF mgs thrie beam transition; 1,407 SY erosion mat class i type b; 71,015 LF temporary marking line paint 6"; 126 LF construction staking curb gutter and curb & gutter.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis