Oklahoma Department of Transportation
State AgencyOK
Aug 19, 2026
Closes
Sep 17, 2026
004, 260226, 37100(18) / 37100(19) / 37100(57), EW - Grade, Drain, Surface, and Bridge
Approx. 13,288 SY Solid slab sodding; 5 AC mowing; 1,688 LF beam guardrail W-beam single; 1 EA guardrail trail end turndown (31"); 7,472 CY unclassified excavation; 1 LS type A-salvaged topsoil; 1,699 SY 4" concrete sidewalk; 2,448 SY 6" concrete driveway; 5 EA manhole (4 LF dia.); 4 EA manhole (6 LF dia.); 27 EA fire hydrants; 1,455 LF 20" steel casing; 670 LF 36" steel casing; 795 LF bore and jack 20" casing; 730 LF bore and jack 36" casing. Project length = 1.761 mi. See outside link and attached file.