Description: REQUEST FOR BID TABOR TO 138KV INTERCONNECTION PROJECT RFB No. 001-02-27 MANDATORY PRE-BID MEETING & SITE VISIT Tuesday, December 15, 2026 @ 9:30 AM BTU System Operations Center 2200 Fountain Avenue Bryan TX 77801 Site Visit Immediately Following Pre-Bid Meeting 6590 FM974, Bryan TX 77808, Take a Right on 1400 Boatcallie Rd ELECTRONIC OR SEALED BIDS TO BE SUBMITTED BY: Tuesday, January 12, 2027 @ 2:00 P.M. CST
SpecialDistrict · TX, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
163 days before RFP
BTU’s Board approved a change order with Burns & McDonnell for additional engineering services for the Tabor Substation Interconnection Project.
Change Order with Burns & McDonnell Engineering for the Tabor Substation Interconnection Project The Board approved a change order to the contract with Burns & McDonnell Engineering for additional engineering services associated with alternate routing, design, and construction options for providing transmission-level service from the Tabor Substation area.
Bryan Texas Utilities Meeting Notes
Board meeting · Jun 8, 2026
Board meeting
163 days before RFP
BTU’s Board approved a contract with Techline, Inc. for six steel poles required to modify and build a transmission line out of the Tabor Substation.
Purchase of Six (6) Steel Poles for a Transmission Project Mr. Randy Trimble, executive director of energy delivery, discussed the need to modify and build a transmission line out of BTU's Tabor Substation, requiring six (6) steel poles. The Board approved a contract with Techline, Inc. for an amount not to exceed $1,396,452 for the purchase of these poles.
Bryan Texas Utilities Meeting Notes
Board meeting · Jun 8, 2026
RFP published
Proposals due (53 days left)
Adjacent opportunities open for bidding right now.
CityIL
Posted
Oct 22, 2026
Dec 3, 2026
May Road 138kV interconnection 34.5kV 3000A breaker purchase.
StateSK
Posted
Nov 16, 2026
Dec 14, 2026
SaskPower seeks qualifications from experienced engineering, procurement and construction contractors with successful transmission-line projects of a similar nature. The project would connect the northern and southern grids through two parallel transmission lines of approximately 250 kilometres and a new eight-position 230 kV switching station between the E.B. Campbell and Island Falls switching stations. SaskPower intends to prequalify up to two respondents for an invitational second-stage RFP, which may include early contractor involvement to refine the project and address design, constructability, schedule, and risk.
CityTX
Posted
Oct 21, 2026
Dec 3, 2026
The City seeks depository services for short-term operating, debt-service, and bond-construction portfolios, as well as long-term core and debt-service reserve portfolios. Investment strategies for operating and debt-service funds should provide liquidity aligned with anticipated cash flows and payment obligations, while the core-fund portfolio should limit market-value volatility through economic cycles. Debt-service reserve investments should generate dependable revenue with low volatility, except where a bond ordinance requires otherwise.
Billings Heights County Water District
Special DistrictMT
Posted
Oct 23, 2026
Nov 30, 2026
Replacement of existing water meters and implementation of a full AMI system, including ultrasonic meters, installation, software, and long-term support.
Decision makers connected to this RFP from Bryan Texas Utilities (BTU).