Discover Opportunities months before the RFP drops
Learn more →Retrieving contract details... Hang tight!
See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
Premium
Clean & enrich your CRM automatically
Premium
Get complete source documentation & analysis
This contract includes 1 purchase order from Sep 25, 2025 to Sep 25, 2025
| Buyer | Vendor | Issued Date | Quantity |
|---|---|---|---|
| Office of the Secretary (OST) | Networking for Future, Inc (NFF) | Sep 25, 2025 | 1 |
Full Purchase Intelligence Available
Get complete pricing, descriptions, and financial details for all 1 purchase orders
Unlock Full Details →See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
No public files available for this contract.
Contract documentation may be available through official government sources or agency portals. Starbridge can help you track down and retrieve these files.
HAND HYGIENE COMPLIANCE MONITORING SYSTEM BPA WHITE RIVER JUNCTION TASK ORDER
Effective Date
Jun 16, 2025
Expires
Effective: Jun 16, 2025
HAND HYGIENE COMPLIANCE MONITORING SYSTEM BPA WHITE RIVER JUNCTION TASK ORDER
ActiveINSTALL CONTINUOUS WATER QUALITY MONITORING FOR LEGIONELLA DIRECTIVE COMPLIANCE
Effective Date
May 24, 2024
Expires
Effective: May 24, 2024
INSTALL CONTINUOUS WATER QUALITY MONITORING FOR LEGIONELLA DIRECTIVE COMPLIANCE
ActiveThis Participating Provider Agreement (PPA) between the Commonwealth of Pennsylvania Department of Health and Promise of Life Network establishes terms for the provision of Sexually Transmitted Disease (STD) clinical services, Pre-Exposure Prophylaxis (PrEP) services, and HIV/STD testing in both clinical and non-clinical settings. The agreement, effective from January 1, 2023, to December 31, 2027, outlines detailed service requirements, provider responsibilities, performance standards, confidentiality protocols, and reimbursement rates for various units of service. It specifies that certain rapid tests and laboratory support are provided at no fee-for-service. The contract emphasizes compliance with state and federal health regulations and includes provisions for monitoring, evaluation, and potential suspension based on funding or performance.
Effective Date
Jan 1, 2023
Expires
Effective: Jan 1, 2023
This Participating Provider Agreement (PPA) between the Commonwealth of Pennsylvania Department of Health and Promise of Life Network establishes terms for the provision of Sexually Transmitted Disease (STD) clinical services, Pre-Exposure Prophylaxis (PrEP) services, and HIV/STD testing in both clinical and non-clinical settings. The agreement, effective from January 1, 2023, to December 31, 2027, outlines detailed service requirements, provider responsibilities, performance standards, confidentiality protocols, and reimbursement rates for various units of service. It specifies that certain rapid tests and laboratory support are provided at no fee-for-service. The contract emphasizes compliance with state and federal health regulations and includes provisions for monitoring, evaluation, and potential suspension based on funding or performance.
ActiveIGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
Effective Date
Mar 23, 2017
Expires
Effective: Mar 23, 2017
Expires:
IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.
ActiveSee who's winning contracts, track spending trends, and identify your best opportunities before your competition.
Schedule Your Demo →Premium
Clean & enrich your CRM automatically
Premium
Get complete source documentation & analysis