Truckee Meadows Water Authority
Special DistrictNV
Posted
Sep 15, 2026
Oct 13, 2026
Pagni 2 Well and Zolezzi 3 Well Construction and Testing
Work includes drill, construct, develop, and test pump two (2) production wells via the dual-tube air flooded reverse drilling method employing concentric dual-wall drill pipe.
