Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 26, 2026
Oct 30, 2026
Harbor and Outfall Monitoring 2027-2030 - (Request for Qualification)
Harbor and outfall monitoring 2027-2030.
Browse RFPs from Massachusetts Water Resources Authority with upcoming deadlines.
11 opportunities shown.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 26, 2026
Oct 30, 2026
Harbor and outfall monitoring 2027-2030.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 26, 2026
Oct 29, 2026
The work includes: preventive maintenance, Class B operator inspection, testing, calibration, and as needed sump pump- outs, of above ground and underground fuel storage tanks located at various Authority facilities.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 19, 2026
Oct 7, 2026
Purchase of Various Pickups, Cargo and Passenger Vans, Electric .
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 26, 2026
Oct 23, 2026
The work includes: Scheduled maintenance and on-call non-emergency and emergency maintenance of overhead doors.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Aug 22, 2026
Oct 2, 2026
Provide maintenance of lawn areas, mowing grass adjacent to 4.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 5, 2026
Nov 11, 2026
All permitting, demolition, surface preparation, testing, temporary protection, phasing, placement and maintenance of barriers, labor, equipment, materials and accessories necessary to perform all work associated with the Massachusetts Water Resources Authority DCR Quabbin Maintenance Building.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 5, 2026
Oct 2, 2026
Monthly maintenance for ozone generator.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 22, 2026
Oct 2, 2026
Analysis requirements for testing DITP sludge digester gas emission samples.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 30, 2026
Oct 21, 2026
The Massachusetts Water Resources Authority is re-soliciting filed sub-bids for HVAC work on the DCR Quabbin Maintenance Building under Contract 7577.
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 12, 2026
Oct 16, 2026
Massachusetts Water Resources Authority
Special DistrictMA
Posted
Sep 19, 2026
Oct 28, 2026
Construct a dewatering drainage line of approx 1,250 LF of 36" reinforced concrete pipe that will discharge to an outfall structure.