Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Purchase 115kV Capacitor Bank Breaker RFP
Lincoln Electric System is soliciting bids for the FOB delivery of four 115kV capacitor bank breakers to Lincoln, Nebraska.
Browse RFPs from Lincoln Electric System with upcoming deadlines.
13 opportunities shown.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Lincoln Electric System is soliciting bids for the FOB delivery of four 115kV capacitor bank breakers to Lincoln, Nebraska.
Special DistrictNE
Posted
Aug 28, 2026
Sep 24, 2026
The Project includes required modifications to the engine generator system such that a feed from the existing plant natural gas supply is designed to provide natural gas at the required pressure for the engines.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Lincoln Electric System Procurement Department is soliciting bids for Purchase Control Cable under bid number 116-26.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Lincoln Electric System is requesting bids for four (4) 115kV capacitor switchers to be furnished and delivered FOB to Lincoln, Nebraska.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Lincoln Electric System Procurement Department is soliciting bids for Purchase Control Cable under bid number 116-26.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Furnish and deliver solid-wall coilable high density polyethylene (HDPE) conduit to house and protect electric power and fiber optic cables.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Furnish and deliver medium voltage cable.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Lincoln Electric System is requesting bids for four (4) 115kV capacitor switchers to be furnished and delivered FOB to Lincoln, Nebraska.
Special DistrictNE
Posted
Sep 17, 2026
Sep 24, 2026
Furnish and deliver street light poles.
Special DistrictNE
Posted
Sep 21, 2026
Oct 8, 2026
Lincoln Electric System is seeking bids from qualified HVAC installers to remove and install four heat pump systems at designated substation locations in accordance with LES specifications.
Special DistrictNE
Posted
Aug 14, 2026
Oct 1, 2026
Provide and implement a project and portfolio management solution.
Special DistrictNE
Posted
Sep 8, 2026
Dec 10, 2026
Installation of new Units 5 and 6 simple cycle CTG packages and all associated BOP equipment into the south powerblock area at TBGS.
Special DistrictNE
Posted
Sep 17, 2026
Oct 6, 2026
Furnish and deliver anchor bolts.