Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Yardley Borough Sewer Authority
Pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, laying, joining and cutting the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting the underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work. Contract No. 26-01 consists of the installation of approx. 600 LF of 10" gravity sewer, 1,700 LF of 15” gravity sewer, 25 LF of 16" gravity sewer, 850 LF of 18" gravity sewer, and approx. 650 LF of 20" gravity sewers, and associated manholes, including three (3) locations of trenchless installation. Whereas Contract No. 26-02 consists of the installation of approx. 50 LF of 8" gravity sewer and approx. 2,800 LF of 15” and 16" gravity sewers, and associated manholes.The project work is covered under two contracts, 26-01 and 26-02 and includes the following: pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, cutting, laying, and joining the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work necessary for the satisfactory installation of the sanitary sewers and appurtenances.
Posted Date
Jun 4, 2026
Due Date
Jul 1, 2026
Release: Jun 4, 2026
Yardley Borough Sewer Authority
Close: Jul 1, 2026
Pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, laying, joining and cutting the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting the underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work. Contract No. 26-01 consists of the installation of approx. 600 LF of 10" gravity sewer, 1,700 LF of 15” gravity sewer, 25 LF of 16" gravity sewer, 850 LF of 18" gravity sewer, and approx. 650 LF of 20" gravity sewers, and associated manholes, including three (3) locations of trenchless installation. Whereas Contract No. 26-02 consists of the installation of approx. 50 LF of 8" gravity sewer and approx. 2,800 LF of 15” and 16" gravity sewers, and associated manholes.The project work is covered under two contracts, 26-01 and 26-02 and includes the following: pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, cutting, laying, and joining the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work necessary for the satisfactory installation of the sanitary sewers and appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Consulting Engineer (Engineer of Record for Yardley Borough Sewer Authority)
Premium
Access the largest public sector contact database
© 2026 Starbridge