Pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, laying, joining and cutting the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting the underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work. Contract No. 26-01 consists of the installation of approx. 600 LF of 10" gravity sewer, 1,700 LF of 15” gravity sewer, 25 LF of 16" gravity sewer, 850 LF of 18" gravity sewer, and approx. 650 LF of 20" gravity sewers, and associated manholes, including three (3) locations of trenchless installation. Whereas Contract No. 26-02 consists of the installation of approx. 50 LF of 8" gravity sewer and approx. 2,800 LF of 15” and 16" gravity sewers, and associated manholes.The project work is covered under two contracts, 26-01 and 26-02 and includes the following:
pre-construction audio/video work, constructing the gravity sewer pipe including clearing and grubbing in easement/unpaved areas, construction entrances, tree protection, removal/relocation/erection of privately owned fences and utilities, marking and saw cutting pavement, excavation (except rock which cannot be removed by excavation machinery) and disposal of all excess material, trenching, sheeting and/or shoring, pumping and bailing, cutting, laying, and joining the pipe, cutting, removing and disposition of any existing pipe to be removed, pipe bedding, backfill and compaction, jack and bore, connecting the pipe to the manholes including creating the necessary openings and channels in existing manholes, supporting underground structures and utilities, soil erosion control measures, traffic control, clean-up and removal of temporary facilities, and all other related work necessary for the satisfactory installation of the sanitary sewers and appurtenances.