Frontier Phase 5a - Water, Sewer, and Drainage Improvements RFP
Posted
-
Dec 2, 2026
Work includes water improvements: approx. 160 LF of 4" pvc water line, 8,030 LF of 8" pvc water line, 8" gate valves, fire hydrants, water services, and related items as depicted for the 191-lot development. Sewer improvements: approx. 6,640 LF of 8" pvc sewer line, 6,020 LF of 12" sewer line, 465 LF of 15" pvc sewer line, 4" sanitary sewer services to 191 lots and 92 future lots, 4'-6' manholes, trench water stops and related items as depicted for the 191-lot development. Drainage improvements: 18-60" rcp, 5'x4' sbc, 6'x4' sbc, 7'x4' sbc drain systems, curb inlets, headwalls, safety end treatments, junction boxes, stone riprap, grade-to-drain channels and other related items as depicted for the 191-lot development. See attached file.



