Public Infrastructure Project RFP
Jul 30, 2026
Closes
Aug 14, 2026
Work specifically includes, but is not limited to, the grading and construction of a new sidewalk and trail along Geneva Ave, utility line and structure relocations along Geneva Ave., construction of Peters Ave. with utilities, E 20th St. and Peters Ave. intersection, construction of 23rd St. with utilities, mass grading of site indi- cated in plan sheets, new NW detention pond with outfall structure and pipe, and soil remediation as indicated in the environmental report. This includes removal of bad soils, bringing in new clean soil, compaction, grading, paving, curb and gutter, paint striping and all associated erosion and sediment control.