Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Winchester Utility System
The furnishing, installing, and testing of approximately 332 LF of 8" SDR 26 PVC gravity sewer, unclassified excavation, backfill, tie-ins, fittings, and working in close proximity with other utilities, traffic control, street barricades and signs, property restoration, pavement restoration, testing, and all other appurtenances and other work as shown on the Construction Drawings or indicated in the Contract Specifications.
Posted Date
Oct 30, 2025
Due Date
Nov 27, 2025
Release: Oct 30, 2025
Winchester Utility System
Close: Nov 27, 2025
The furnishing, installing, and testing of approximately 332 LF of 8" SDR 26 PVC gravity sewer, unclassified excavation, backfill, tie-ins, fittings, and working in close proximity with other utilities, traffic control, street barricades and signs, property restoration, pavement restoration, testing, and all other appurtenances and other work as shown on the Construction Drawings or indicated in the Contract Specifications.
Winchester Utility System
Work includes approx 4,590 LF 18" PVC PS gravity sewer; 80 LF 18" PVC PS 115 gravity sewer steel casing pipe by jack and bore; 3,000 LF silt fencing. See outside link.
Posted Date
-
Due Date
Jun 17, 2025
Winchester Utility System
Close: Jun 17, 2025
Work includes approx 4,590 LF 18" PVC PS gravity sewer; 80 LF 18" PVC PS 115 gravity sewer steel casing pipe by jack and bore; 3,000 LF silt fencing. See outside link.
Winchester Utility System
Furnishing and installation for the rehabilitation of wastewater pumping station, including bypass pumping, the removal of designated equipment and appurtenances, an additive alternative that includes the preparation and painting of walls, floor, and structural steel beams, and all other work as shown on the contract drawings while limiting interruptions to the current pumping facilities.
Posted Date
-
Due Date
Aug 15, 2024
Release: -
Winchester Utility System
Close: Aug 15, 2024
Furnishing and installation for the rehabilitation of wastewater pumping station, including bypass pumping, the removal of designated equipment and appurtenances, an additive alternative that includes the preparation and painting of walls, floor, and structural steel beams, and all other work as shown on the contract drawings while limiting interruptions to the current pumping facilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Winchester Utility System's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Winchester Utility System's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database