Bellaire Pond Construction
Aug 18, 2026
Closes
Sep 9, 2026
Project consists of but not limited to: 3 EA clearing; 1 EA const drainage structure design sd-60; 795 CY excavation - common; 1 EA const drainage control structure; 190 CY common topsoil borrow; 1100 SY rolled erosion prevention category 25; 40 LF 12" RC pipe sewer class III; 5 EA coniferous shrub 4' Ht Cont; 31 LF 30" RC pipe sewer class III; 3 EA deciduous shrub 3 Ht Cont.