Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Western Nassau Water Authority
Work includes construction of a masonry and brick building around the existing wellhead treatment system. The treatment system consists of two 12' dia 40,000 pound granular activated carbon (gac) vessels. Additional scope includes replacing the roof for well building no. 28b, new site drainage, and site improvements to repair sink holes including new asphalt paving.
Posted Date
May 7, 2026
Due Date
Jun 4, 2026
Release: May 7, 2026
Western Nassau Water Authority
Close: Jun 4, 2026
Work includes construction of a masonry and brick building around the existing wellhead treatment system. The treatment system consists of two 12' dia 40,000 pound granular activated carbon (gac) vessels. Additional scope includes replacing the roof for well building no. 28b, new site drainage, and site improvements to repair sink holes including new asphalt paving.
AvailableWestern Nassau Water Authority
Locating and Marking.
Posted Date
Apr 24, 2025
Due Date
May 5, 2025
Release: Apr 24, 2025
Western Nassau Water Authority
Close: May 5, 2025
Locating and Marking.
Western Nassau Water Authority
Work includes preliminary site work including utility mark-outs, erection of safety fencing, erosion control, clearing and grubbing; select site demolition; excavation, trenching, removal of excess and/or unsuitable excavated material, excavation support and protection, import of suitable material, soil compaction, and testing; restoration of existing site drainage; removal and replacement of damaged concrete bollards; removal and replacement of external pipe support pier; construction of concrete retaining wall; new pavement work to restore undermined driveway; daily cleaning and general site maintenance; final cleaning, grading, topsoil and seeding.
Posted Date
Sep 23, 2024
Due Date
Nov 1, 2024
Release: Sep 23, 2024
Western Nassau Water Authority
Close: Nov 1, 2024
Work includes preliminary site work including utility mark-outs, erection of safety fencing, erosion control, clearing and grubbing; select site demolition; excavation, trenching, removal of excess and/or unsuitable excavated material, excavation support and protection, import of suitable material, soil compaction, and testing; restoration of existing site drainage; removal and replacement of damaged concrete bollards; removal and replacement of external pipe support pier; construction of concrete retaining wall; new pavement work to restore undermined driveway; daily cleaning and general site maintenance; final cleaning, grading, topsoil and seeding.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Western Nassau Water Authority
The operating plan includes a summary of revenue requirements, debt coverage ratio calculations, and comparisons of operation and maintenance expenses between the proposed plan and previous fiscal years. It details the proposed tariff rates for various service classifications and outlines the breakdown of required rate relief by element. The plan also includes summaries of changes in revenue requirements and revenue forecasts.
The operating plan includes a financial forecast for the fiscal year June 2021 - May 2022. It covers the projection of revenues, expenses, and required rate relief, including a summary of the revenue requirement, debt coverage ratio, and comparisons of operation and maintenance expenses to prior operating plans and fiscal years. The plan also details proposed tariff rates for metered and fire protection customers and a breakdown of required rate relief by element.
The operating plan includes a summary of the revenue requirement, a debt coverage ratio calculation, and a comparison of total operation and maintenance expenses to the prior operating plan. It also details production, transmission and distribution, customer service, and administrative and general expenses. The plan outlines proposed tariff rates for metered and fire protection customers, and includes a breakdown of required rate relief and a summary of changes in the revenue requirement.
The operating plan includes a financial forecast with a proposed 2.5% rate change. It covers various aspects such as revenue requirements, debt coverage ratios, and comparisons of operation and maintenance expenses between the proposed plan and the prior operating plan. The plan details proposed tariff rates for metered and fire protection customers, along with a breakdown of required rate relief by element and a summary of changes in revenue requirements.
The operating plan includes a financial forecast for the fiscal year June 2019 - May 2020. It covers projected revenues, expenses, and required rate relief. Key components of the plan include a summary of the revenue requirement, debt coverage ratio calculation, and a comparison of operation and maintenance expenses to the prior operating plan. The plan also details proposed tariff rates for metered and fire protection customers.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Western Nassau Water Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge