Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Waterloo Water Works
Project includes all labor, materials, and equipment necessary to construct improvements as shown and specified at Well 15 and Well 17 including, but not limited to, new standby power system, well pump VFD controls, facility electrical power distribution wiring devices, process piping and valves, booster pump and motor, new CMU building addition, building ventilation, chemical feed improvements, painting, site work, and miscellaneous associated work, including cleanup.
Posted Date
May 20, 2026
Due Date
Jun 16, 2026
Release: May 20, 2026
Waterloo Water Works
Close: Jun 16, 2026
Project includes all labor, materials, and equipment necessary to construct improvements as shown and specified at Well 15 and Well 17 including, but not limited to, new standby power system, well pump VFD controls, facility electrical power distribution wiring devices, process piping and valves, booster pump and motor, new CMU building addition, building ventilation, chemical feed improvements, painting, site work, and miscellaneous associated work, including cleanup.
AvailableWaterloo Water Works
The extent of the work involved is an approximate 5,714 LF of 16" trenched excavation Class 52 ductile water main installation, and approx 1,955 LF of 12" trenched excavation Class 52 ductile water main and appurtenances to connect the existing water main to the new water main
Posted Date
Jan 7, 2026
Due Date
Feb 18, 2026
Release: Jan 7, 2026
Waterloo Water Works
Close: Feb 18, 2026
The extent of the work involved is an approximate 5,714 LF of 16" trenched excavation Class 52 ductile water main installation, and approx 1,955 LF of 12" trenched excavation Class 52 ductile water main and appurtenances to connect the existing water main to the new water main
Waterloo Water Works
Pump Building improvements to include, but not be limited to, new roof insulation, coverboard, and roof membrane; scuppers; roof drains; roof vents; masonry tuckpointing and crack repair; parapet cap removal and installation of new metal copping; interior roof access ladder and scuttle; interior attic access hatch; repairing of existing windows; removal and installation of new CMU wall base with skip coating as required; attic platform and guardrails; and miscellaneous associated work, including demolition and cleanup.
Posted Date
-
Due Date
Feb 11, 2025
Release: -
Waterloo Water Works
Close: Feb 11, 2025
Pump Building improvements to include, but not be limited to, new roof insulation, coverboard, and roof membrane; scuppers; roof drains; roof vents; masonry tuckpointing and crack repair; parapet cap removal and installation of new metal copping; interior roof access ladder and scuttle; interior attic access hatch; repairing of existing windows; removal and installation of new CMU wall base with skip coating as required; attic platform and guardrails; and miscellaneous associated work, including demolition and cleanup.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge