Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pump Building improvements to include, but not be limited to, new roof insulation, coverboard, and roof membrane; scuppers; roof drains; roof vents; masonry tuckpointing and crack repair; parapet cap removal and installation of new metal copping; interior roof access ladder and scuttle; interior attic access hatch; repairing of existing windows; removal and installation of new CMU wall base with skip coating as required; attic platform and guardrails; and miscellaneous associated work, including demolition and cleanup.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Iowa Department of Transportation is soliciting Construction Manager at Risk (CMAR) services to design and construct a new building at the Waterloo DOT complex (1875 W. Ridgeway Ave., Waterloo, IA). The RFP requests preconstruction and construction management services and requires bidders to meet Iowa Division of Labor registration and bonding/financial requirements. The solicitation was posted in late December 2025 and proposals are due Feb 10, 2026; the procurement is hosted on the State of Iowa’s public procurement portal.
Posted Date
Dec 24, 2025
Due Date
Feb 10, 2026
Release: Dec 24, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Iowa Department of Transportation is soliciting Construction Manager at Risk (CMAR) services to design and construct a new building at the Waterloo DOT complex (1875 W. Ridgeway Ave., Waterloo, IA). The RFP requests preconstruction and construction management services and requires bidders to meet Iowa Division of Labor registration and bonding/financial requirements. The solicitation was posted in late December 2025 and proposals are due Feb 10, 2026; the procurement is hosted on the State of Iowa’s public procurement portal.
AvailableWork consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
Posted Date
Sep 2, 2025
Due Date
Mar 6, 2026
Release: Sep 2, 2025
Close: Mar 6, 2026
Work consist of demolition, asphalt driveway, yard piping, tank drain assembly, pump building interior piping assembly, vertical turbine pumps, sodium hypochlorite pump skid and chemical storage, caustic pump skid and chemical storage, generator, fuel system improvements, mechanical HVAC improvements, electrical improvements, structural improvements, 500,000 gallon ground storage tank, bypass operations.
AvailableThe project as a whole includes improvements to the main pump station. Improvements include demolition of existing building, equipment, HVAC, electrical, controls, Scada equipment, lighting, plumbing, and concrete and replacement of electrical, controls, HVAC, Scada equipment, lighting, and plumbing. The project also includes installation of concrete, access hatches, and all related work. Owner will be performing tree removal and fence replacement during the construction.
Posted Date
Jan 9, 2026
Due Date
Feb 11, 2026
Release: Jan 9, 2026
Close: Feb 11, 2026
The project as a whole includes improvements to the main pump station. Improvements include demolition of existing building, equipment, HVAC, electrical, controls, Scada equipment, lighting, plumbing, and concrete and replacement of electrical, controls, HVAC, Scada equipment, lighting, and plumbing. The project also includes installation of concrete, access hatches, and all related work. Owner will be performing tree removal and fence replacement during the construction.
AvailableProcurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement for the installation of a 30,000-gallon welded steel ground storage tank, a 3,000-gallon hydro-pneumatic tank, a premanufactured pump station building with packaged pump station skid controls, air compressor, flow meters, site piping, site grading, controls disinfection boosting system, and related appurtenances.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →