Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
W7N2 USPFO Activity Txang 147
HQ Flooring and optional kitchen remodel including installation.
Posted Date
Mar 18, 2026
Due Date
Apr 10, 2026
Release: Mar 18, 2026
W7N2 USPFO Activity Txang 147
Close: Apr 10, 2026
HQ Flooring and optional kitchen remodel including installation.
AvailableW7N2 USPFO Activity Txang 147
Inspection services of currently owned Aircraft Shelters. The repairs will consist of: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to operate and maintain the required inspections. Structures are designed to require a minimal amount of maintenance over the life of the structures. The inspection should be performed bi-annually or after the structures are exposed to winds or snow loads close to the designed limit of the structure.
Posted Date
Feb 18, 2026
Due Date
Mar 5, 2026
Release: Feb 18, 2026
W7N2 USPFO Activity Txang 147
Close: Mar 5, 2026
Inspection services of currently owned Aircraft Shelters. The repairs will consist of: The contractor shall provide all management, tools, supplies, equipment, and labor necessary to operate and maintain the required inspections. Structures are designed to require a minimal amount of maintenance over the life of the structures. The inspection should be performed bi-annually or after the structures are exposed to winds or snow loads close to the designed limit of the structure.
W7N2 USPFO Activity Txang 147
Demolish and remove the existing steel pavilion structure measuring approx.65ft L x 80ftW x 25ft H (contractor to verify field). Work includes full removal of all structural components and the restoration of the site to a safe and clean condition.
Posted Date
Sep 9, 2025
Due Date
Sep 18, 2025
Release: Sep 9, 2025
W7N2 USPFO Activity Txang 147
Close: Sep 18, 2025
Demolish and remove the existing steel pavilion structure measuring approx.65ft L x 80ftW x 25ft H (contractor to verify field). Work includes full removal of all structural components and the restoration of the site to a safe and clean condition.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track W7N2 USPFO Activity Txang 147's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database