Stormwater Management Program RFP
Posted
Sep 24, 2026
Oct 20, 2026
Work include 933' pipe removed, 24" diameter and under; 352' pipe removed, over 24" diameter; 10 ea catch basin or inlet removed; 2490 cy excavation; 210 cy embankment; 25 sf 4" concrete walk, as per plan; 190' fill and plug existing conduit, 12" conduit; 147' fill and plug existing conduit, 24" conduit; 376' pipe cleanout, 24" diameter and under; 192' pipe cleanout, 27" to 48" diameter; 1142' 18" conduit, type b; 199' crack sealing, type iv.
