Discover Opportunities months before the RFP drops
Learn more →Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
AvailableWork include 146 SY concrete driveways removed; 293 SY asphalt driveways; 303 LF curb removed; 210 CY excavation; 449 LF 6" base pipe underdrains; 396 LF curb; 14 LF 12" conduit; 312 SY seeding and mulching; 3,465 SY pavement planing; 614 LF full depth pavement sawing; 45 CY asphalt concrete; 45 CY asphalt concrete base; 116 CY aggregate base 8"; 153 CY asphalt concrete surface; 8" non-reinforced concrete pavement; 402 LF removal of pavement marking; 108 LF stop line; 506 LF crosswalk line; 845 LF dotted line 8";
Posted Date
Aug 6, 2025
Due Date
Dec 16, 2025
Release: Aug 6, 2025
Close: Dec 16, 2025
Work include 146 SY concrete driveways removed; 293 SY asphalt driveways; 303 LF curb removed; 210 CY excavation; 449 LF 6" base pipe underdrains; 396 LF curb; 14 LF 12" conduit; 312 SY seeding and mulching; 3,465 SY pavement planing; 614 LF full depth pavement sawing; 45 CY asphalt concrete; 45 CY asphalt concrete base; 116 CY aggregate base 8"; 153 CY asphalt concrete surface; 8" non-reinforced concrete pavement; 402 LF removal of pavement marking; 108 LF stop line; 506 LF crosswalk line; 845 LF dotted line 8";
AvailableWork includes approx 8,600 SY pavement planing, asphalt concrete; 2,250 LF 8" type B sanitary sewer; 100 LF 16" casing pipe jack and bore; 1 LS preconstruction video. See outside link.
Posted Date
Mar 19, 2025
Due Date
Apr 3, 2025
Release: Mar 19, 2025
Close: Apr 3, 2025
Work includes approx 8,600 SY pavement planing, asphalt concrete; 2,250 LF 8" type B sanitary sewer; 100 LF 16" casing pipe jack and bore; 1 LS preconstruction video. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis