Discover Opportunities months before the RFP drops
Learn more →Work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system.\r \r Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces.\r \r Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system.\r \r Cathodic Protection: Install an impressed current cathodic protection system.\r \r Repairs:\r 1)Install a gasket on the wet interior roof hatch.\r 2)Install handholds at the roof hatches.\r 3)Install ladder extension at the condensate platform.\r 4)Install a sample tap on the fill/draw pipe.\r 5)Install a chemical feed tap on the fill/draw pipe.\r 6)Replace the expansion joint.\r 7)Install an aluminum jacketing over the fill/draw pipe insulation in the riser.\r 8)Replace the mud valve.\r 9)Overflow discharge modification.\r 10)Weld a rigging lug on the bowl.\r 11)Replace the dry interior light bulbs.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Work includes: Exterior: High pressure water clean (5,000 to 10,000 psi) and spot power tool clean to a SSPC-SP11 standard. Apply a three (3) coat epoxy urethane system.\r \r Dry Interior: Abrasive blast clean the entire tops of the platforms (including 1 ft. up the riser wall), the entire bowl, the entire access tube, and spot coating failures throughout to a SSPC-SP6 commercial standard. Apply a three (3) coat epoxy system to the access tube and bowl and a spot two (2) coat epoxy system to the rest of the prepared surfaces.\r \r Foundation: Repair grout, repair cracks, repair spalls. Water clean and apply a two (2) coat epoxy system.\r \r Cathodic Protection: Install an impressed current cathodic protection system.\r \r Repairs:\r 1)Install a gasket on the wet interior roof hatch.\r 2)Install handholds at the roof hatches.\r 3)Install ladder extension at the condensate platform.\r 4)Install a sample tap on the fill/draw pipe.\r 5)Install a chemical feed tap on the fill/draw pipe.\r 6)Replace the expansion joint.\r 7)Install an aluminum jacketing over the fill/draw pipe insulation in the riser.\r 8)Replace the mud valve.\r 9)Overflow discharge modification.\r 10)Weld a rigging lug on the bowl.\r 11)Replace the dry interior light bulbs.
AvailableLead service line replacements work includes approx. 1,748' 33 "Yard Side" water services; approx. 10' 1 "Street Side" water service; 34 water service home connections; 34 curb box replacement, including all necessary appurtenances and restoration.
Posted Date
Apr 14, 2025
Due Date
May 2, 2025
Release: Apr 14, 2025
Close: May 2, 2025
Lead service line replacements work includes approx. 1,748' 33 "Yard Side" water services; approx. 10' 1 "Street Side" water service; 34 water service home connections; 34 curb box replacement, including all necessary appurtenances and restoration.
Provide lead service material verification (potholing). Including all necessary appurtenances and restoration.
Posted Date
Jul 26, 2024
Due Date
Aug 8, 2024
Release: Jul 26, 2024
Close: Aug 8, 2024
Provide lead service material verification (potholing). Including all necessary appurtenances and restoration.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis