Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lead service line replacements work includes approx. 1,748' 33 "Yard Side" water services; approx. 10' 1 "Street Side" water service; 34 water service home connections; 34 curb box replacement, including all necessary appurtenances and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Premium
Access the largest public sector contact database
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
The Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
The Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
AvailableThis work may include hma and concrete pavement removal and replacement; trench excavation; bedding and backfill; installation of new water services from water main to curb stop and box; installation of new water services from curb stop and box to building; site restoration; traffic control; testing and all other work necessary for complete and functional water service replacement installations meeting city standards.
Posted Date
Nov 7, 2025
Due Date
Jan 9, 2026
Release: Nov 7, 2025
Close: Jan 9, 2026
This work may include hma and concrete pavement removal and replacement; trench excavation; bedding and backfill; installation of new water services from water main to curb stop and box; installation of new water services from curb stop and box to building; site restoration; traffic control; testing and all other work necessary for complete and functional water service replacement installations meeting city standards.
AvailableUnit Price Lead Service Line Replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Unit Price Lead Service Line Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis