Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Oreana
The proposed work consists of hauling approx. 710 Tons of seal coat aggregate to stockpile, pulverizing approx. 3,700 SY of various Village streets, and seal coating approx. 53,000 SY of various Village streets. There is anticipated to be 76 tons of bituminous materials and 710 tons of seal coat aggregate needed to complete the work.
Posted Date
Apr 8, 2026
Due Date
Apr 15, 2026
Release: Apr 8, 2026
Village of Oreana
Close: Apr 15, 2026
The proposed work consists of hauling approx. 710 Tons of seal coat aggregate to stockpile, pulverizing approx. 3,700 SY of various Village streets, and seal coating approx. 53,000 SY of various Village streets. There is anticipated to be 76 tons of bituminous materials and 710 tons of seal coat aggregate needed to complete the work.
AvailableVillage of Oreana
Work includes to replace approx. 4,430 LF of undersized watermain with new 8" and 6" watermain in the village, including service replacement up to the public right of way line and surface restoration of excavated areas. 1 LS bond, insurance and mobilization; 20 LF 4" c-900 dr 18 watermain; 3,166 LF 6" c-900 dr 18 watermain; 764 LF 8" c-900 dr 18 watermain; 16 EA water service short, 3/4"; 22 EA water service long, 3/4"; 38 EA abandon water meter pit; 38 EA relocate water meter pit; 1,500' trench backfill, watermain; 563 LF 6" hdpe watermain directional bore; 135 LF 8" hdpe watermain directional bore; 6 EA 6" tapping sleeve & valve; 2 EA 4" tapping sleeve & valve; 9 EA 6" gv and box; 2 EA 4" gv and box; 1 EA 8" gv and box; 1 EA 6" inserting valve and box; 8 EA fire hydrant assembly. See attached file.
Posted Date
Feb 6, 2025
Due Date
Mar 25, 2025
Release: Feb 6, 2025
Village of Oreana
Close: Mar 25, 2025
Work includes to replace approx. 4,430 LF of undersized watermain with new 8" and 6" watermain in the village, including service replacement up to the public right of way line and surface restoration of excavated areas. 1 LS bond, insurance and mobilization; 20 LF 4" c-900 dr 18 watermain; 3,166 LF 6" c-900 dr 18 watermain; 764 LF 8" c-900 dr 18 watermain; 16 EA water service short, 3/4"; 22 EA water service long, 3/4"; 38 EA abandon water meter pit; 38 EA relocate water meter pit; 1,500' trench backfill, watermain; 563 LF 6" hdpe watermain directional bore; 135 LF 8" hdpe watermain directional bore; 6 EA 6" tapping sleeve & valve; 2 EA 4" tapping sleeve & valve; 9 EA 6" gv and box; 2 EA 4" gv and box; 1 EA 8" gv and box; 1 EA 6" inserting valve and box; 8 EA fire hydrant assembly. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Village of Oreana
The agenda included the approval of the Treasurer's Report for November 2025, old business, new business such as the approval of a payment request from E.L. Pruit, approval of change order request(s) regarding the water main project, and a discussion regarding 2026 Water/Sewer Rates. The meeting also covered administrative reports, approval of a payment request form E.L. Pruitt, approval of change order request (s) regarding the main water project, approval of an engineering services agreement for phase 2 of the public work building with TWM Engineering, approval of Ordinance 2025-11-18-1 Annual Tax Levy, approval of Ordinance 2025-11-18-2, Annual abatement Ordinance and the Grocery tax discussion.
The Village of Oreana Board of Trustees held meetings on January 15th and January 18th, 2022. Key discussions included the West Plains drainage issue, a waste hauling contract, water tower design options, and the approval of change order #3 for Maguire Iron. The board also approved the consent agenda for January 18th, which included the treasurer's report, bills, and payment application #6 for Maguire Iron.
The Board of Trustees meeting on May 18th, 2021, included the approval of the Treasurer's report, bills, and minutes from the April 20th meeting. Key decisions involved appointing officials to fill vacant trustee positions, approving a loan agreement for a new water tower, a motor fuel tax resolution, sidewalk repairs, and an event request from Small Town Living. Public comment was also part of the agenda.
The Village of Oreana Board of Trustees meeting on November 16, 2021, covered several key items, including the approval of the treasurer's report, bills, and meeting minutes from September and October 2021. New business included approving Ordinance 2021-11-16-1 (Annual Tax Levy and Abatement Ordinance), a request from Small Town Living, the purchase of electronic equipment, and a seasonal leaf vac program. A resolution authorizing a waiver from the requirement to hire 90% Illinois workers for Maguire Iron was also approved.
The Village Board meeting of January 19, 2016, was called to order with a quorum present despite some absences. The meeting included a presentation by FTC Robotics Group #5202, approval of the consent agenda (including December and January financial reports and November 2015 meeting minutes), and public comment regarding drainage concerns. The board approved the 2016-01-19-1 Bond Levy Abatement Ordinance but deferred discussion on accepting electronic payments for utility billing.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Oreana's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database