Stream Restoration RFP
Aug 4, 2026
Closes
Aug 20, 2026
80-foot extension of a 36” double-walled storm sewer pipe within the Sandy Beaver Creek through Canal Park. Grading and shaping existing canal banks to 2:1 slopes, rock channel protection, dredging and site restoration.
