Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Hartville
Paving program. Work includes 2,533 SY of pavement repair; 760 CY of type 1 asphalt concrete surface course; 1,064 CY of type 2 asphalt concrete intermediate course; 25 SF of concrete curb and gutter; 65 SF of crosswalk line. See outside link.
Posted Date
Feb 3, 2025
Due Date
Feb 27, 2025
Release: Feb 3, 2025
Village of Hartville
Close: Feb 27, 2025
Paving program. Work includes 2,533 SY of pavement repair; 760 CY of type 1 asphalt concrete surface course; 1,064 CY of type 2 asphalt concrete intermediate course; 25 SF of concrete curb and gutter; 65 SF of crosswalk line. See outside link.
Village of Hartville
Project consists of pavement planning, asphalt repairs, asphalt intermediate and surface courses, catch basins, storm sewer conduit, pavement markings, restoration and other work.
Posted Date
Feb 19, 2026
Due Date
Mar 6, 2026
Release: Feb 19, 2026
Village of Hartville
Close: Mar 6, 2026
Project consists of pavement planning, asphalt repairs, asphalt intermediate and surface courses, catch basins, storm sewer conduit, pavement markings, restoration and other work.
Village of Hartville
Sanitary sewer line replacement. Work includes 124 CY of asphalt concrete base; 124 CY of aggregate base; 26 CY of asphalt concrete surface course; 135 LF of 6" sanitary sewer lateral; 9 EA 6" sanitary sewer lateral connection and tee or wye replacement; 234 LF of 8" sanitary sewer; 238 LF of 8" sanitary sewer trenchless; 3 EA No.3 manhole; 472 LF of bypass pumping. See outside link.
Posted Date
Jan 29, 2025
Due Date
Feb 27, 2025
Release: Jan 29, 2025
Village of Hartville
Close: Feb 27, 2025
Sanitary sewer line replacement. Work includes 124 CY of asphalt concrete base; 124 CY of aggregate base; 26 CY of asphalt concrete surface course; 135 LF of 6" sanitary sewer lateral; 9 EA 6" sanitary sewer lateral connection and tee or wye replacement; 234 LF of 8" sanitary sewer; 238 LF of 8" sanitary sewer trenchless; 3 EA No.3 manhole; 472 LF of bypass pumping. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue; pivot to coops immediately.
Coops: Lead with cooperative purchasing (Sourcewell or Ohio DAS programs). Validate your contract coverage and propose a coop purchase to avoid a formal bid. If coops aren’t feasible, prepare for a formal competitive RFP.
Entity: Village of Hartville, Ohio.
Evidence: No record of sole source usage (2004–2025). Treat sole source as non-viable.
Board meetings and strategic plans from Village of Hartville
The Board of Public Affairs meeting included the nomination of a Committee Chair person, approval of requisitions for 2018, and approval for Jim Baxter, Tom Graber, and Steve Wise to attend a workshop. The November Monthly Report indicated no violations. Sludge hauling for 2017 was discussed, noting that completion was hindered by cold weather. New grates were installed in 2017, and meters were discussed, but no decision was made. The engineering for the WWTP Back-up generator is expected to be complete by the end of the first quarter of 2018.
The Board of Public Affairs convened to discuss various topics, including financial matters such as accepting minutes, approving bill payments, reviewing the monthly financial report for January 2018, and approving PTI requests for specific addresses. The Plant Manager provided a report covering monthly performance, TDS levels at the Danbury Glen Lift Station, Ohio EPA inquiries regarding the Sunnyside Lift Station, and meter readings at different lift stations. The Engineer reported on the 619 Project's sanitary sewer relocation, plan review, scheduling, and the timeline for the Generator Project.
The Board discussed locking in electric rates for 2019, a new heater purchase for the filter room, the annual sewer sludge report, a NEFCO application, a roof leak repair, and assessment planning. A question was raised regarding waiving the tap-in fee for a new home construction due to a previous tap at the location. The Engineer discussed plans for the Gentle Brook Condos and the Village's potential ownership of the sanitary sewer lines, as well as the design draft for the sanitary sewer line.
The Board of Public Affairs meeting included discussions on a proposal from RCAP for GPS Data and GIS Mapping. The Plant Manager reported no violations for May, provided updates on the sewer cleaning project, addressed call outs at the High School and Sunnyside Lift Stations, and presented requisitions. The board accepted the RCAP proposal for GPS Data Collections and GIS Mapping project and discussed sanitary sewer projects scheduled to start in July.
The meeting included discussions regarding the video taping of sewer lines, a TDS study for the Sunnyside Lift Station, and alarms triggered by high flow due to rain. Updates were provided on the generator project, which is awaiting EPA review, and the status of sewer lines, which are ready to be sent out to contractors.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Village of Hartville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database