Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Village of Elkhart Lake
Removal/abandonment of existing water main, sanitary sewer, and storm sewer including. All pipes services, lateral, hydrant, valves, fittings and structures. All ditch grades, pipe sizes, pipe invert elevations (IE), and storm sewer structure RIMS/IE must be verified in field. The depth for new storm structures and nyloplast drain basin is approx., Locations of sanitary laterals shown on plans are schematic only and shall be verified in field during construction.
Posted Date
May 29, 2026
Due Date
Jun 12, 2026
Release: May 29, 2026
Village of Elkhart Lake
Close: Jun 12, 2026
Removal/abandonment of existing water main, sanitary sewer, and storm sewer including. All pipes services, lateral, hydrant, valves, fittings and structures. All ditch grades, pipe sizes, pipe invert elevations (IE), and storm sewer structure RIMS/IE must be verified in field. The depth for new storm structures and nyloplast drain basin is approx., Locations of sanitary laterals shown on plans are schematic only and shall be verified in field during construction.
AvailableVillage of Elkhart Lake
Project consists of a new municipal building. The new Welcome Center is a 2,198 SF facility that will include a new visitor/tourist lobby area, a conference room, staff offices, staff toilet and break area, mechanical room and toilets for adjacent park use, accessed from the exterior and adjacent plaza to be used for public events. This is only a solicitation for flooring. The work includes providing approx. 200 SF of epoxy resin flooring and approx. 440 SF of epoxy terrazzo flooring work at the new Welcome Center. The work includes epoxy resin flooring at 2 exterior accessed toilet rooms and one exterior accessed storage room. The epoxy terrazzo flooring work will be located within the new lobby space and includes a terrazzo representation. BP 9.4A - Resinous Flooring.
Posted Date
Nov 21, 2025
Due Date
Dec 4, 2025
Release: Nov 21, 2025
Village of Elkhart Lake
Close: Dec 4, 2025
Project consists of a new municipal building. The new Welcome Center is a 2,198 SF facility that will include a new visitor/tourist lobby area, a conference room, staff offices, staff toilet and break area, mechanical room and toilets for adjacent park use, accessed from the exterior and adjacent plaza to be used for public events. This is only a solicitation for flooring. The work includes providing approx. 200 SF of epoxy resin flooring and approx. 440 SF of epoxy terrazzo flooring work at the new Welcome Center. The work includes epoxy resin flooring at 2 exterior accessed toilet rooms and one exterior accessed storage room. The epoxy terrazzo flooring work will be located within the new lobby space and includes a terrazzo representation. BP 9.4A - Resinous Flooring.
Village of Elkhart Lake
Public works facility. The 15,091 SF facility will include a new drive-through shop/storage area for Village public works vehicles, for both parking and repair, a vehicle wash bay, office area for Public Works support staff and a mezzanine space for additional Public Works storage. The Work includes a complete exterior architectural precast wall panel system around the full building exterior. The roof system consists of steel bar joists, metal roof deck, rigid insulation and fully adhered EPDM roofing system. Also included are aluminum storefront entrances, windows and glazed clerestories. Interior partitions at the office area will be gypsum board on metal stud framing and CMU load bearing partitions for shop area storage rooms below an upper level mezzanine. Finishes to include Solvent based oil, water and stain repellent sealer with penetrating Silane at shop area and vinyl luxury tile and acoustical tile ceilings throughout the office area. Painting work to include all walls throughout the facility and including high performance coatings throughout the shop area. Mechanical systems, plumbing systems, electrical systems and sitework are part of the project.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Village of Elkhart Lake
Close: Dec 11, 2025
Public works facility. The 15,091 SF facility will include a new drive-through shop/storage area for Village public works vehicles, for both parking and repair, a vehicle wash bay, office area for Public Works support staff and a mezzanine space for additional Public Works storage. The Work includes a complete exterior architectural precast wall panel system around the full building exterior. The roof system consists of steel bar joists, metal roof deck, rigid insulation and fully adhered EPDM roofing system. Also included are aluminum storefront entrances, windows and glazed clerestories. Interior partitions at the office area will be gypsum board on metal stud framing and CMU load bearing partitions for shop area storage rooms below an upper level mezzanine. Finishes to include Solvent based oil, water and stain repellent sealer with penetrating Silane at shop area and vinyl luxury tile and acoustical tile ceilings throughout the office area. Painting work to include all walls throughout the facility and including high performance coatings throughout the shop area. Mechanical systems, plumbing systems, electrical systems and sitework are part of the project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge