Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Boyceville's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Village Engineer
Building Inspector
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Boyceville
The Project includes the following Work: At the WWTF (STR. 20, 21, 22, 23, & 24) – Equipment demolition, selective structural demolition, new wood framed blower and electrical building with metal siding, standing seam metal roofing, and concrete foundation. New positive displacement blowers, electrical equipment, lagoon fine and coarse bubble aeration, lagoon surface aerators, groundwater process well, valves, piping, flow meters, level elements, erosion control, painting, plumbing, HVAC, instrumentation & controls, and SCADA system. Lift Station No. 1 (STR. 11) – Equipment demolition, selective structural demolition, new dry pit raw wastewater pumps, valves, piping, flowmeters, level elements, painting, electrical equipment, control panel, instrumentation & controls, and telemetry. \r Lift Station No. 2 (STR. 12) – Equipment demolition, selective structural demolition, new dry pit raw wastewater pumps, valves, piping, flowmeters, level elements, painting, electrical equipment, control panel, generator, instrumentation & controls, and telemetry. Lift Station No. 3 (STR .13) – Selective structural demolition, new submersible raw wastewater pumps, new FRP wetwell and valve vault, valves, piping, flowmeters, level elements, erosion control, painting, electrical equipment, control panel, generator, instrumentation & controls, and telemetry.
Posted Date
Feb 12, 2025
Due Date
Mar 10, 2025
Release: Feb 12, 2025
Village of Boyceville
Close: Mar 10, 2025
The Project includes the following Work: At the WWTF (STR. 20, 21, 22, 23, & 24) – Equipment demolition, selective structural demolition, new wood framed blower and electrical building with metal siding, standing seam metal roofing, and concrete foundation. New positive displacement blowers, electrical equipment, lagoon fine and coarse bubble aeration, lagoon surface aerators, groundwater process well, valves, piping, flow meters, level elements, erosion control, painting, plumbing, HVAC, instrumentation & controls, and SCADA system. Lift Station No. 1 (STR. 11) – Equipment demolition, selective structural demolition, new dry pit raw wastewater pumps, valves, piping, flowmeters, level elements, painting, electrical equipment, control panel, instrumentation & controls, and telemetry. \r Lift Station No. 2 (STR. 12) – Equipment demolition, selective structural demolition, new dry pit raw wastewater pumps, valves, piping, flowmeters, level elements, painting, electrical equipment, control panel, generator, instrumentation & controls, and telemetry. Lift Station No. 3 (STR .13) – Selective structural demolition, new submersible raw wastewater pumps, new FRP wetwell and valve vault, valves, piping, flowmeters, level elements, erosion control, painting, electrical equipment, control panel, generator, instrumentation & controls, and telemetry.
Village of Boyceville
Street Construction, 30 LF wide with 24" curb and gutter 783 LF, Sanitary Sewer, 8" & appurtenances 772 LF, Water Main, 8" & appurtenances 1287 LF Storm Sewer, 12" & appurtenances 318 LF Storm Sewer, 15" & appurtenances 32 LF Storm Sewer, 18" & appurtenances 122 LF.
Posted Date
Dec 20, 2024
Due Date
Jan 23, 2025
Release: Dec 20, 2024
Village of Boyceville
Close: Jan 23, 2025
Street Construction, 30 LF wide with 24" curb and gutter 783 LF, Sanitary Sewer, 8" & appurtenances 772 LF, Water Main, 8" & appurtenances 1287 LF Storm Sewer, 12" & appurtenances 318 LF Storm Sewer, 15" & appurtenances 32 LF Storm Sewer, 18" & appurtenances 122 LF.