Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not supported; pivot to formal bid or a compliant cooperative.
Coops: Educate on Ohio DAS Cooperative Purchasing/State Term Contracts, ODOT Co-op (vehicles/equipment), and NASPO ValuePoint as faster, compliant paths.
Village of Bellaire: No evidence of sole source flexibility. Treat sole source as non-viable and plan for a formal competitive bid or a cooperative contract instead.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Village of Bellaire's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Village of Bellaire
Work will include the following items: installation of erosion and sedimentation controls and stormwater management pond. Demolition of ballfield fencing necessary for new work. Site grading necessary for new access roadway, stormwater management pond, and preparation of subgrades for installation of pickleball courts, concession stand, performance stage pavilion, site concrete, and aggregate parking area. Installation of storm sewer collection system installation of concrete drive apron, ada parking areas, and associated sidewalks installation of water service line and sanitary force main piping to future concession stand bedding aggregate and select aggregate backfill for storm and utility piping aggregate surfacing for access drive and parking area. Traffic control and maintenance pavement demolition and restoration seeding and mulching of lawn areas
Posted Date
Nov 3, 2025
Due Date
Jan 14, 2026
Release: Nov 3, 2025
Village of Bellaire
Close: Jan 14, 2026
Work will include the following items: installation of erosion and sedimentation controls and stormwater management pond. Demolition of ballfield fencing necessary for new work. Site grading necessary for new access roadway, stormwater management pond, and preparation of subgrades for installation of pickleball courts, concession stand, performance stage pavilion, site concrete, and aggregate parking area. Installation of storm sewer collection system installation of concrete drive apron, ada parking areas, and associated sidewalks installation of water service line and sanitary force main piping to future concession stand bedding aggregate and select aggregate backfill for storm and utility piping aggregate surfacing for access drive and parking area. Traffic control and maintenance pavement demolition and restoration seeding and mulching of lawn areas
AvailableVillage of Bellaire
Project is to complete site grading as necessary and install an engineering control consisting of a minimum two-foot-thick soil cap to restrict direct contact with underlying soils that were historically impacted with metals and pahs. Existing stormwater infrastructure will also need to be reconfigured to properly drain stormwater from the subject property into existing stormwater infrastructure. See attached file.
Posted Date
Jul 7, 2025
Due Date
Jul 31, 2025
Release: Jul 7, 2025
Village of Bellaire
Close: Jul 31, 2025
Project is to complete site grading as necessary and install an engineering control consisting of a minimum two-foot-thick soil cap to restrict direct contact with underlying soils that were historically impacted with metals and pahs. Existing stormwater infrastructure will also need to be reconfigured to properly drain stormwater from the subject property into existing stormwater infrastructure. See attached file.
Village of Bellaire
The Project includes the following Work: Phase 2 will be the installation of 214 LF of H-pile retaining wall with concrete lagging.
Posted Date
Jul 22, 2024
Due Date
Aug 22, 2024
Release: Jul 22, 2024
Village of Bellaire
Close: Aug 22, 2024
The Project includes the following Work: Phase 2 will be the installation of 214 LF of H-pile retaining wall with concrete lagging.