Guy Grant Phase 1 - Utilities Improvements (Request for Proposals)
Posted
Sep 13, 2026
Oct 2, 2026
Project includes approx. 4,250 LF of 30" Sanitary Sewer Main by Cured-In-Place Pipe; 4,675 LF of 8" PVC, C-900, DR-18 Water Line (Asphalt Paved Areas) (Including HMAC Pavement Repair); 100 LF of 16" Steel Casing (Installed by Boring) (Includes Pavement Repair of Bore Pits); 15 EA of Water Service (Long Side) (1" service line with 3/4" Meter).
