Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Veolia Water Milwaukee LLC
Install a new screw conveyor to replace dryer feed screw conveyor #7 located on the 2nd floor of the bldg. 258 dewatering and drying facility located at the water reclamation facility. The contractor is fully responsible for the design of a new conveyor that will not clog and must ensure all equipment meets applicable standards and specifications, while accommodating the existing facility infrastructure and operational requirements.
Posted Date
Jul 1, 2026
Due Date
Aug 3, 2026
Release: Jul 1, 2026
Veolia Water Milwaukee LLC
Close: Aug 3, 2026
Install a new screw conveyor to replace dryer feed screw conveyor #7 located on the 2nd floor of the bldg. 258 dewatering and drying facility located at the water reclamation facility. The contractor is fully responsible for the design of a new conveyor that will not clog and must ensure all equipment meets applicable standards and specifications, while accommodating the existing facility infrastructure and operational requirements.
AvailableVeolia Water Milwaukee LLC
Replace the existing cylinder in kind, as well as associated piping and valves between the cylinder and the hydraulic power unit (HPU). The existing HPU and the existing gate will remain.
Posted Date
Apr 15, 2026
Due Date
May 15, 2026
Release: Apr 15, 2026
Veolia Water Milwaukee LLC
Close: May 15, 2026
Replace the existing cylinder in kind, as well as associated piping and valves between the cylinder and the hydraulic power unit (HPU). The existing HPU and the existing gate will remain.
Veolia Water Milwaukee LLC
Project contemplated herein consists of the Contractor replacing unit 258-ASU-23 and its associated air cooled condensing unit 258-ACCU-23 entirely with new units in-kind except for capacity.
Posted Date
Dec 8, 2025
Due Date
Jan 20, 2026
Release: Dec 8, 2025
Veolia Water Milwaukee LLC
Close: Jan 20, 2026
Project contemplated herein consists of the Contractor replacing unit 258-ASU-23 and its associated air cooled condensing unit 258-ACCU-23 entirely with new units in-kind except for capacity.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge