The project procures construction services to consolidate the Tico Mutual Water Company system by installing 6- and 8-inch water mains, installing residential water meters and associated services, and removing an existing 6-inch PVC pipeline. Work also includes temporary potable water highline provision, disconnection from the existing Tico system, trench pavement repairs, and installation of two fire hydrant assemblies, plus pressure testing, disinfection and bacteriological testing. The work is located in unincorporated Ventura County (Oak View) and is a prevailing-wage public works contract with specific bonding, licensing and insurance requirements.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Ojai
County
The county where this buyer is located.
Ventura
Address
Physical address of this buyer.
409 Old Baldwin Rd
Phone Number
Contact phone number for this buyer.
(805) 646-3403
Zip Code
Postal code for this buyer's location.
93023
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Ventura River County Water District
Ventura River Water District Regular Meeting
Date: Mar 9, 2016Type: Meeting mention
The Board discussed the Upper Ventura River Basin Boundary Modification Application and adopted Resolution 2016-296. Action was taken to reject all current bids for the Well #7 drilling project with plans to re-advertise. Key discussions included the formation of the Groundwater Sustainability Agency JPA, the initial draft of the FY 2016/17 budget, and the procedural process for filling an upcoming board vacancy. Additionally, the Board reviewed the General Manager's report on water levels and operations, and conducted an executive session regarding pending litigation and personnel performance.
Ventura River Water District Regular Meeting
Date: Nov 20, 2024Type: Meeting mention
The board addressed a customer billing dispute, approving a credit for the customer. Discussions were held regarding Proposition 218 notices and public hearing scheduling for water rate increases. A budget amendment was approved for roof repairs. The board authorized a contract for construction management support on the Tico Consolidation project and adopted resolutions for two WaterSmart grant projects involving meter improvements and turf replacement. Additionally, the board voted for a representative to LAFCo and received reports on district aquifer levels and well pumping status.
Key Contacts
Public-sector contacts connected to Ventura River County Water District.
The Board discussed the review of a draft ordinance regarding state-mandated water conservation and received a presentation on geophysical survey results for a potential new well site. Key actions included awarding a contract for the Well #3 replacement monitoring wells to Cascade Well Drilling, L.P., and authorizing technical assistance from Kear Groundwater. The Board reviewed a report on the status of operational goals and the General Manager's update on well production and water usage. An executive session was held to discuss personnel matters and a legal case, resulting in the approval of a settlement agreement. Additional items included discussions on LAFCO election schedules, by-law updates, and insurance certificate requirements for sub-contractors.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Ventura River County Water District meetings, strategic plans, and budget discussions before the public bid appears.