Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Valley Branch Watershed District
Work includes purchasing, delivering, storing, and applying liquid aluminum sulfate and liquid sodium aluminate (together referred to in the Contract Documents as aluminum) to the lake to mitigate the internal release of phosphorus from lake sediment. There are two applications of aluminum proposed for Downs Lake. The Work is to be completed by May 31, 2027 for the 1st application and by October 1, 2028 for the 2nd application. The 2nd application must not commence until favorable\r conditions in the spring of 2028.
Posted Date
Jul 17, 2026
Due Date
Aug 4, 2026
Release: Jul 17, 2026
Valley Branch Watershed District
Close: Aug 4, 2026
Work includes purchasing, delivering, storing, and applying liquid aluminum sulfate and liquid sodium aluminate (together referred to in the Contract Documents as aluminum) to the lake to mitigate the internal release of phosphorus from lake sediment. There are two applications of aluminum proposed for Downs Lake. The Work is to be completed by May 31, 2027 for the 1st application and by October 1, 2028 for the 2nd application. The 2nd application must not commence until favorable\r conditions in the spring of 2028.
AvailableValley Branch Watershed District
The Project consists of removing six flood prone homes and includes, but is not limited to: mobilization and demobilization; temporary erosion controls; permanent erosion controls; traffic control; clearing, grubbing, tree removal, and tree protection; soil excavation, disposal and grading; residential structure and outbuilding hazardous material assessment and abatement; building demolition; residential structure and outbuilding removals; utility abandonment and removal; abandoning septic tanks in place; closing private wells; permitting; seeding and site restoration; all as provided for in the Bidding Documents.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Valley Branch Watershed District
Close: Feb 3, 2026
The Project consists of removing six flood prone homes and includes, but is not limited to: mobilization and demobilization; temporary erosion controls; permanent erosion controls; traffic control; clearing, grubbing, tree removal, and tree protection; soil excavation, disposal and grading; residential structure and outbuilding hazardous material assessment and abatement; building demolition; residential structure and outbuilding removals; utility abandonment and removal; abandoning septic tanks in place; closing private wells; permitting; seeding and site restoration; all as provided for in the Bidding Documents.
Valley Branch Watershed District
Purchasing, delivering, storing, and applying liquid aluminum sulfate and liquid sodium aluminate (together referred to in the Contract Documents as aluminum) to the lake to mitigate the internal release of phosphorus from lake sediment.
Posted Date
Jul 16, 2024
Due Date
Aug 7, 2024
Release: Jul 16, 2024
Valley Branch Watershed District
Close: Aug 7, 2024
Purchasing, delivering, storing, and applying liquid aluminum sulfate and liquid sodium aluminate (together referred to in the Contract Documents as aluminum) to the lake to mitigate the internal release of phosphorus from lake sediment.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Valley Branch Watershed District
The board discussed several items, including approval of the consent calendar excluding an item related to beaver removal, which was later approved for payment based on a detailed report. The meeting also covered the Minnesota Pollution Control Agency's draft permit for the Simmeron Park wastewater treatment plant, with the board approving a comment letter emphasizing sanitary sewer connection. Finally, the board discussed a $350,000 grant awarded for chloride source control and reduction, authorizing staff to proceed with the necessary grant application revisions and administrative requirements.
The Board approved the 2026-2035 Watershed Management Plan and discussed the Minnesota Pollution Control Agency's draft reissued permit for the Simmeron Park Wastewater Treatment Plant. The discussion highlighted concerns regarding flood analysis, potential impacts on Rose Lake, and the need for connection to urban sanitary sewer services. Additionally, the Board reviewed a culvert replacement project on Joselyn Road and determined not to assume ownership of the culverts, recommending the city maintain responsibility.
The agenda includes a public forum, a consent calendar featuring a wetland replacement plan notice, a payment recommendation for the Goose Lake aluminum treatment, an intergovernmental agreement regarding the citizen-assisted monitoring program, a permit maintenance agreement, various native plant grants and reimbursements, and a sponsorship for the Metro Children's Water Festival. Business and reports cover proposed resolutions from Minnesota Watersheds, a presentation on the 2026-2035 Watershed Management Plan to the Board of Water and Soil Resources, and a presentation to the Baytown Township Board.
The board discussed and approved several items, including the consent calendar, the approval of permit 2026-19 for the Farms of Aptton, and permit 2026-22 for the Gilen Shoreline in Lake Elmo. There was also a significant discussion regarding a resolution for storm water runoff reuse, with the board considering co-authoring the resolution with other watershed districts to address plumbing code challenges. The board received updates on an ongoing erosion issue and a legal matter regarding a property owner near a permit project. Additionally, a manager provided an update on a completed photo project.
The meeting included a public hearing regarding amendments to the water district's disability regulations. Key discussion topics focused on the transition to utilizing the Washington Conservation District for inspection services, the mechanics of these inspections, the frequency of site visits, and the professional protocol for addressing potential compliance issues and managing communication with property owners. The board also reviewed the estimated financial costs associated with these inspection services.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Valley Branch Watershed District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant District Engineer, Valley Branch Watershed District (Senior Civil Engineer, Barr Engineering Co.)
President, Board of Managers, Valley Branch Watershed District
Premium
Access the largest public sector contact database
© 2026 Starbridge